Übach-Palenberg Station
History
The Herzogenrath to Rheydt section of the Aachen–Mönchengladbach railway was opened on 11 November 1852 and a year later the Aachen-Düsseldorf-Ruhrort Railway Company completed its line between Aachen–Düsseldorf line. At this time Palenberg did not have its own station. The exact year in which the first station was built has no been determined. In the statistics of the year 1861, it is not mentioned, but in 1881 in the Official Journal (referring to special trains during the Great Pilgrimage to Aachen Cathedral) a station at Palenberg is mentioned. During this time a station must have been built on the western outskirts of Palenberg, which was then a small hamlet and was part of the still independent municipality of Frelenberg. In 1912, a siding was built for the Carolus Magnus colliery and on the site there is now a commuter parking area, which was built in the 1990s next to the wooden station building. Palenberg and the station became part of the new municipality of Ubach-Palenberg in 1935 and a year later the new station building was built on the eastern side and the station was renamed Ubach-Palenberg. This building was enlarged in 2002 and converted into a youth and seniors centre.
The station lost much of its purpose with the closure of the Carolus Magnus mine in 1962.
Work began on the complete transformation of the station area in 2000. The old station building was converted into a seniors centre and new premises for a youth center were built next to it. Seniors and youth have been able to meet at the former station building since 2002, which was declared a "multi-generational house" in 2008. In November 2007, the crossovers were removed and the third track and the Üf signalbox were abandoned. The station was thus converted into a Haltepunkt ("halt", that is having no crossovers). These renovations were carried out together with the connection of the signals and points on the section of the line between Ubach-Palenberg and Rheydt Hauptbahnhof to the Grevenbroich electronic signalling centre. In 2009, reconstruction started to provide the platforms with barrier-free access. The third platform, which was no longer usable, was demolished during this work. The newly reconstructed platforms were commissioned on 16 August 2010. With the generous park-and-ride facilities on the west and east sides, the station provides access to trains for commuters by car or bicycle. In addition, it is possible to rent lockable bicycle storage boxes.
Rail services
The station is served by the following services:
Line | Line name | Route | ||
---|---|---|---|---|
RE 4 | Wupper-Express | Aachen – Herzogenrath – Übach-Palenberg – Lindern – Erkelenz – Rheydt – Mönchengladbach – Düsseldorf – Wuppertal – Hagen – Witten&nbs – Dortmund | ||
RB 33 | Rhein Niers Bahn | Aachen Hbf - Übach-Palenberg – Lindern (portions coupled/uncoupled) | – Mönchengladbach – Duisburg – Mülheim – Essen | |
– Heinsberg |
References
- ^ "Stationspreisliste 2025" [Station price list 2025] (PDF) (in German). DB Station&Service. 28 November 2024. Retrieved 5 December 2024.
- ^ Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
- ^ "Liniennetzplan Region Heinsberg" (PDF). Aachener Verkehrsverbund. 1 January 2020. Retrieved 12 June 2020.
- ^ "VRS-Gemeinschaftstarif" (PDF) (in German). Verkehrsverbund Rhein-Sieg. 20 April 2020. p. 207. Retrieved 9 May 2020.
- ^ Joost, André. "Übach-Palenberg station operations". NRW Rail Archive (in German). Retrieved 12 June 2020.
- ^ Lothar Bildhauer. "Zechengelände der Grube Carolus Magnus, in Übach-Palenberg" (PDF; 820 kB) (in German). Retrieved 3 July 2013.
- ^ "Carlous Magnus" (in German). Bergbaumuseum-grube-anna.de. Retrieved 3 July 2013.
- ^ "Übach-Palenberg" (in German). Retrieved 3 July 2013.
- ^ Guido Radermacher. "Grube Carolus Magnus, Übach-Palenberg" (in German). Retrieved 3 July 2013.
- ^ Joost, André. "Ubach-Palenberg station". NRW Rail Archive (in German). Retrieved 12 June 2020.