Loading
  • 21 Aug, 2019

  • By, Wikipedia

28 May (Baku Metro)

(Future)

TramHistoryOpened6 November 1967 (1967-11-06)Services
Preceding station Baku Metro Following station
Sahil Red line Ganjlik
towards Hazi Aslanov or Bakmil
Nizami Ganjavi
towards Darnagul
Green line
Terminus Green line (separated part)
transfer at Jafar Jabbarly
Shah Ismail Khatai
Terminus

28 May is a Baku Metro station. It was opened on 6 November 1967. It was formerly called 28 April. It is connected to the adjacent Baku Central Railway Station by a pedestrian tunnel.

Connections

Connections from

to Jafar Jabbarly (Baku Metro), at the

and also to Baku railway station.

Aerobus

BakuBus H1 buses run 24 hours a day from 28 May Metro Station to Baku Airport.

See also

References

  1. ^ "Baku Metro". UrbanRail. Archived from the original on 2016-09-19. Retrieved 2016-09-26.