816 Nuclear Military Plant
History
The project was started in 1966 when Sino-Soviet relations dramatically declined (see also the Sino-Soviet split). To enhance China's national defence and prevent possible Soviet invasion and nuclear attack, the project was approved (directly by then-Premier Zhou Enlai) and undertaken in secret. More than 60,000 engineering soldiers of the People's Liberation Army participated in the construction of the base. The underground base was designed to be able to tolerate thousands of tons of TNT explosives and 8-magnitude earthquakes.
The project was under construction for 17 years, and the construction was nearly completed in 1984. In 1964 China made its first public nuclear test. Largely due to change in the Cold War international situation, the project was cancelled in February 1984. It was further declassified in April 2002. In April 2010, after being closed for over 25 years, the base was opened to tourists.
Structure
The surface area of the cave is more than 104,000 m, and the total length of the tunnels is more than 20 kilometers. The whole complex consists of 13 levels, 18 artificial caves linked to each other, and has more than 80 roads and 130 tunnels. Automobiles are able to pass the roads and tunnels inside. The base has the “World's Largest Artificial Cave”, which has a height of 79.6 meters, roughly equal to that of a 20-floor building.
See also
References
- ^ "Former nuclear plant opening as tourist attraction". China Daily. 2010-04-13. Archived from the original on 16 April 2010. Retrieved 23 May 2010.
- ^ Christina Wang (April 28, 2010). "Chongqing 816 Nuclear Defense Cave Will Open to the Public". www.prlog.org. Retrieved 23 May 2010.
- ^ 图集:重庆地下核工厂首次作为旅游景点开放 (in Chinese). Tencent QQ News. 2010-04-26. Archived from the original on 29 April 2010. Retrieved 23 May 2010.