The Andong Dam is an embankment dam on the Nakdong River, 4 km (2 mi) east of Andong in Gyeongsangbuk-do province, South Korea.
The purpose of the dam is flood control, water supply and hydroelectric power generation. Construction of the dam began in 1971 and was complete in 1976. The 83 m (272 ft) tall rock-fill, central clay core dam withholds a reservoir of 1,248,000,000 m (1,011,770 acre⋅ft) and provides water to an 90 MW pumped-storage power station. The lower reservoir (afterbay) for the power station is created by a 20 m (66 ft) high and 238 m (781 ft) long weir. The power plant is operated by the Korea Hydro and Nuclear Power (KHNP) organisation.
See also
References
- ^ "Andong Dam Multi-Purpose Development Project". SMEC Holdings. Archived from the original on 16 March 2012. Retrieved 4 August 2011.
- ^ "Andong Dam (안동댐)". english.visitkorea.or.kr. Retrieved 2019-05-27.
- ^ Lee, Soontak. "Dam-Break Flood Risk Management: Nakdong River Case Studies" (PDF). Retrieved 4 August 2011.
- ^ "Andong Multipurpose Dam". Department of Civil Engineering, College of Engineering GyeongSang National University. Retrieved 4 August 2011.
- ^ "Andong PS Hydroelectric Power Plant South Korea - GEO". globalenergyobservatory.org. Retrieved 2019-05-27.