Arkansas Highway 230
Route description
Locust Grove to Southside
AR 230 begins in Locust Grove at AR 14/AR 25. The route runs east through Jamestown to Southside, where it terminates at US 167.
Cave City to Strawberry
AR 230 begins in Cave City at US 167. It runs east to Strawberry, where it meets AR 25 and terminates. It does not cross or concur with any other state highways.
Alicia to Bono
AR 230 begins in Alicia at Arkansas Highway 367 (Former US 67).The route runs east to meet the new U.S. Route 67 Freeway (Future Interstate 57) and AR 91 in rural Lawrence County. AR 230 continues east to cross US 63 outside of Bono, terminating at US 63 BUS.
Brookland to Dixie
AR 230 runs due east from US 49 BUS in Brookland to AR 135 in Dixie.
History
Highway 230 was first authorized by the Arkansas State Highway Commission (ASHC) on July 10, 1957 between Cave City and Strawberry. A second route was designated between Alicia and Bono on June 23, 1965, with a third highway created between Brookland and Dixie on January 12, 1966. The final section was created on April 26, 1978 when Highway 14 was rerouted onto Highway 25 toward Batesville. Highway 230 replaced the Highway 14 designation between Locust Grove and Southside.
Major intersections
County | Location | mi | km | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Independence | Locust Grove | 0.00 | 0.00 | AR 14 / AR 25 – Batesville, Mountain View, Heber Springs | Western terminus | ||
Southside | 8.15 | 13.12 | US 167 (Batesville Boulevard) – Batesville, Bald Knob | Eastern terminus | |||
Gap in route | |||||||
Sharp | Cave City | 0.00 | 0.00 | US 167 (Main Street) – Batesville, Ash Flat | Western terminus | ||
Lawrence | Strawberry | 13.80 | 22.21 | AR 25 (Main Street) / AR 117 north – Cord, Lynn, Jesup | Eastern terminus, AR 117 southern terminus | ||
Gap in route | |||||||
Alicia | 0.00 | 0.00 | AR 367 – Swifton, Hoxie | Western terminus; former US 67 | |||
| Future I-57 / US 67 – Little Rock, Walnut Ridge | US 67 exit 111. | |||||
| 8.34– 0.00 | 13.42– 0.00 | AR 91 south – Grubbs, Hoxie | Southern end of AR 91 concurrency | |||
| 9 | 14 | AR 91 north | Northern end of AR 91 concurrency | |||
| 2.5 | 4.0 | AR 349 north | AR 349 southern terminus | |||
Craighead | Bono | 7.59 | 12.21 | US 63 – Jonesboro, Hoxie | |||
7.91 | 12.73 | US 63B | Eastern terminus | ||||
Gap in route | |||||||
Brookland | 0.00 | 0.00 | US 49B | Western terminus | |||
Dixie | 7.04 | 11.33 | AR 135 – Lake City, Paragould | Eastern terminus | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Former routes
Brookland
Location | Brookland |
---|---|
Length | 1.6 mi (2.6 km) |
Existed | May 23, 1973–April 27, 1979 |
Highway 230 (AR 230, Ark. 230, and Hwy. 230) is a former state highway of 1.6 miles (2.6 km) in Craighead County.
Route description
The route began at a county road junction and ran east to Highway 1 north of Brookland.
History
A segment of Highway 230 was created north of Brookland on March 28, 1973 pursuant to Act 9 of 1973 by the Arkansas General Assembly at the request of the Arkansas County Judge. The act directed county judges and legislators to designate up to 12 miles (19 km) of county roads as state highways in each county. The entire route was deleted on April 27, 1979 in a swap involving many highways requested by the Craighead County Judge.
Major intersections
The entire route was in Craighead County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.0 | 0.0 | CR 762 (Pine Log Road) / CR 763 | Western terminus | |
| 1.6 | 2.6 | AR 1 – Brookland, Paragould | Eastern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Swifton
Location | Jackson County |
---|---|
Length | 2.28 mi (3.67 km) |
Existed | April 23, 1975–February 28, 1979 |
Highway 230 (AR 230, Ark. 230, and Hwy. 230) is a former state highway of 2.28 miles (3.67 km) in Jackson County.
Route description
The route began at a county road junction and ran east to US 67 (now Highway 367) northeast of Swifton.
History
A segment of Highway 230 was created northeast of Swifton on April 23, 1975. The Jackson County Judge proposed an exchange to delete the entire route in exchange for the creation of Highway 224. The ASHC authorized the exchange on February 28, 1979.
Major intersections
The entire route was in Jackson County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.00 | 0.00 | CR 70 | Western terminus | |
| 2.28 | 3.67 | US 67 – Hoxie, Newport | Eastern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
See also
References
- ^ System Information and Research Division (2014). "Arkansas Road Log Database". Arkansas State Highway and Transportation Department. Archived from the original (MDB) on August 29, 2017. Retrieved March 27, 2016.
- ^ "Minutes" (1953–69), p. 1795.
- ^ "Minutes" (1953–69), p. 1787.
- ^ "Minutes" (1953–69), pp. 675–676.
- ^ "Minutes" (1953–69), p. 407.
- ^ "Minutes" (1970–79), p. 269.
- ^ "Minutes" (1970–79), pp. 1163–1164.
- ^ "Minutes" (1970–79), pp. 66–67.
- ^ Arkansas State Highway and Transportation Department: Planning and Research Division, Policy Analysis Section (2010). "Development of Highway and Transportation Legislation in Arkansas: A Review of the Acts Relative to Administering and Financing Highways and Transportation in Arkansas" (PDF). Little Rock: Arkansas Department of Transportation. p. 13. Archived from the original (PDF) on February 6, 2020.
- ^ "Minutes" (1970–79), p. 810.
- ^ "Minutes" (1970–79), p. 31.
- "Minutes of the Meeting" (PDF). Arkansas State Highway Commission. 1953–1969. Archived from the original (PDF) on October 1, 2018. Retrieved January 2, 2017.
- "Minutes of the Meeting" (PDF). Arkansas State Highway Commission. 1970–1979. Archived from the original (PDF) on November 5, 2011. Retrieved January 2, 2017.
External links
Media related to Arkansas Highway 230 at Wikimedia Commons