The tunnel is 1,318 metres (4,324 ft) above sea level with the road above the tunnel having an elevation of 1,793 metres (5,883 ft).
It was built between July 1974 and December 1978, and its costs amounted to 4 billion Austrian schillings (~300 million €). The tunnel is designed for 1800 vehicles per hour and equipped with 4 ventilation centres (one shaft with a height of 736 metres is the deepest in Europe), 12 vents, 43 cameras for traffic monitoring and 16 niches. In 1998 the tunnel was used by 2.6 million vehicles, where 18% are accounting for freight transport. The Arlberg Tunnel is a Toll Road with a one-way fee of €11 (as of October 2019). Tolls for both directions are collected at the eastern end of the tunnel.
In summer 2023 and 2024 it is closed from April to October for repairing works.