Loading
  • 21 Aug, 2019

  • By, Wikipedia

Avadi Railway Station

Avadi railway station (station code: AVD) is an NSG–2 category Indian railway station in Chennai railway division of Southern Railway zone. It is one of the major railway terminals of the Chennai CentralArakkonam section of the Chennai Suburban Railway Network. It serves the neighbourhood of Avadi, a suburb of Chennai located 23 km west of the city centre. It is situated at Tirumalairajapuram locality of Avadi, with an elevation of 26.85 m above sea level. According to a railway release in 2008, there are plans to develop Avadi station as a coaching terminal (satellite terminal) for Chennai Central railway station, on the lines of Tambaram station being developed as a terminal for Egmore railway station. Later in 2023, the plans of making Avadi, Ambattur or Villivakkam as terminal were dropped, and Perambur was chosen for development of terminal station.

History

The first lines in the station were electrified on 29 November 1979, with the electrification of the Chennai Central–Tiruvallur section. The EMU car shed lines at Avadi were electrified on 1 February 1980. Additional lines at the station were electrified on 2 October 1986, with the electrification of the Villivakkam–Avadi section.

The electrification preliminaries, such as poles, were observed on the railway lines passing through Avadi Railway Station as early as 1977. The first broad-gauge electric EMUs were first introduced on the Madras Central–Gummidipoondi section by 1979 and in the next phase on the Madras Central–Tiruvallur section around 1980. From around 1971 to 1980, there these beastly WP steam locomotives that were hauling the Suburban trains going up to Tiruvallur and Gumidipoondi. The WDS category shuttle diesel were seen pulling the Pattabiram Military Siding trains going up to E Depot in the Avadi Air Force Station Cantonment Area. It helped identifying the trains. As for the express trains passing through Avadi, those were diesel electrics. In the late 1960s and early 1970s, it was probably the Baldwin Class WP steam locos that were hauling trains such as Dadar Express and Bombay Mail from Kalyan, taking over the duties from the mighty WCM DC Electrics operating on the Bombay–Kalyan route.

Layout

The station has six tracks, including two loop lines, and has four platforms. The first platform is a side platform housing the station's entrance and the ticket counter, and the second and third are part of an island platform. The fourth platform borders the northern end of the station and is the longest of all the platforms. The platforms are connected by means of a footbridge.

As of 2013, the station handles about 40,000 passengers a day.

Station layout

G North Entrance Street level Exit/Entrance & ticket counter
P FOB, Side platform | P4Express Lines
Platform 4 Towards → MGR Chennai Central
Platform 3 Towards ← Arakkonam Junction / Jolarpettai Junction
FOB, Island platform | P2 Doors will open on the left | P3Express Lines
Platform 2 Towards → Chennai Central MMC next station is Annanur
Platform 1 Towards ← Arakkonam Junction next station is Hindu College
FOB, Side platform | P1 Doors will open on the left
G South Entrance Street level Exit/Entrance & ticket counter

Projects and development

Avadi is one of the 73 stations in Tamil Nadu to be named for upgradation under Amrit Bharat Station Scheme of Indian Railways. It is also in the Chennai Suburban Railway network that are being developed as Adarsh stations.

A metro rail connectivity to Avadi by Red line corridor of Chennai Metro, linking this railway station is currently in DPR-planning stage.

See also

References

  1. ^ "IR Electrification Chronology up to 31.03.2004". History of Electrification. IRFCA.org. Retrieved 17 November 2012.
  2. ^ "Go northwest, but don't take a train". The Times of India. Chennai: The Times Group. 27 April 2013. Archived from the original on 30 June 2013. Retrieved 28 April 2013.
  3. ^ "SOUTHERN RAILWAY LIST OF STATIONS AS ON 01.04.2023 (CATEGORY- WISE)" (PDF). Portal of Indian Railways. Centre For Railway Information Systems. 1 April 2023. p. 1. Archived from the original (PDF) on 27 March 2024. Retrieved 23 March 2024.
  4. ^ "Plans to develop Avadi or Ambattur railway station". The Times of India. Chennai. 16 November 2008. Archived from the original on 4 January 2013. Retrieved 23 August 2012.
  5. ^ "AMRIT BHARAT STATIONS". Press Information Bureau. New Delhi. 10 February 2023. Retrieved 6 April 2024.
  6. ^ "Nemilichery station to be ready in three months". The Times of India. Chennai. 4 August 2009. Archived from the original on 3 January 2013. Retrieved 4 October 2012.