Ayrılık Çeşmesi (Istanbul Metro)
Ayrılık Çeşmesi is an underground station on the M4 line of the Istanbul Metro. It was opened on 29 October 2013 to provide a connection to the Marmaray station and trains crossing the Bosphorus, a year after the rest of the line's first stage (which opened on 17 August 2012). Ayrılık Çeşmesi has an island platform serviced by two tracks.
Station Layout
P Platform level |
Westbound | ← toward Kadıköy |
Island platform, doors will open on the left | ||
Eastbound | toward Sabiha Gökçen Airport → |
References
- ^ "M4 Kadıköy-Kartal Metro Hattı". Istanbul Ulaşım. Archived from the original on 2015-04-23.
- ^ "Istanbul Metro Map". Turkey Travel Planner. Retrieved 2019-11-02.