Badalingchangcheng Railway Station
The total floorage of the station is 49,000 square metres (530,000 sq ft), including 9,000 square metres (97,000 sq ft) overground station building and 40,000 square metres (430,000 sq ft) underground track area and platform area. The platforms and the station building are beneath the Great Wall and located 60 metres (200 ft) below the surface, making it the deepest high-speed railway station in the world. The architectural design manages to extend the mountain and the natural landscape within the resort itself.
This station is designed by AREP and China Railway Engineering Consulting Group, and constructed by China Railway 5th Engineering Group. On 23 August 2019 , the station building successfully capped, marking the completion of all station buildings on Jingzhang HSR.
See also
References
- ^ "看!北京八达岭长城站如何引领"全国之最"". 18 September 2020. Archived from the original on 6 November 2021.
- ^ "Jingzhang HSR Badalingchangcheng station capped". Retrieved 4 August 2019.
- ^ "跨越百年 京张高铁正式开通". 2 January 2020.
- ^ "China is building deepest high-speed railway station under Great Wall - China". Chinadaily.com.cn. Retrieved 26 May 2022.
- ^ "Badaling: A high-speed railway station beneath China's Great Wall". Arep.fr - AREP Group. Retrieved 26 December 2019.