Baranagar Metro Station
History
Then in February 2019, the metro line to the Dakshineswar station was projected to be operational by February 2020. A slightly delayed March 2020 projected operation date was announced in late 2019. And a July 2020 projected operation date was mentioned in February 2020. By June 2019, over 95 percent of the viaduct had been completed for the between Noapara and Dakshineswar and that work had begun on the signalling system and laying of the tracks.
Station layout
L1 Platforms |
Side platform, doors will open on the left | |
Platform 2 | Blue Line toward Kavi Subhash (Noapara) Change at the next station for Yellow Line → | |
Platform 1 | ← Blue Line toward Dakshineswar (terminus) | |
Side platform, doors will open on the left | ||
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Connections
Train
It is connected with Baranagar Road railway station of Chord link line of Kolkata Suburban Railway .
Bus
This station is connected with B.T. Road and Belghoria Expressway.
Bus route numbers 26, 26C, 32A, 34B, 56, 78, 78/1, 79, 81/1, 201, 214, 214A, 222, 230, 234, 234/1, 285, DN2, DN2/1, DN9/1, DN43, DN44, DN46, K4, S159 (Mini), S180 (Mini), S185 (Mini), C28, E32, S11, S15G, S23A, S32, S32A, S57, AC2B, AC20, AC23A, AC50, AC50A, AC54, EB1A etc. serve the station.
Auto
Several auto services are available on B. T. Road towards Sodepur, Dakshineswar, Sinthee, Barrackpore.