Barbara And Jack Davis Hall
The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm. The building is constructed in accordance with LEED's Gold certificate standards.
Naming
The building is named after industrialist-turned-political candidate Jack Davis and his wife Barbara, who made the largest endowment ($5 million) among individuals to fund the project. The couple made their first donation of $1.5 million to fund the project in 2008. Jack, a UB Engineering graduate in 1955, and his wife donated an additional $3.5 million to the project making themselves the people who have made the largest endowment in university's history with $5 million endowment.
Tenants
Departments
The building is the new home to Computer Science and Electrical Engineering departments. However, the building supports five other departments such as Mechanical and Aerospace Engineering, Biomedical Engineering, Civil, Structural and Environmental Engineering, Industrial and Systems Engineering and Chemical and Biological Engineering.
Labs
Notable features
Facilities and research centers
- 5,000 sq ft (460 m) of Cleanroom space
- Two 3D Electrical Engineering Labs
- A smart room
- A surgery lab
- A multimedia lab
- A security lab
- Two visualization labs
- Eleven flexible, multi-purpose labs
- Center of Excellence for Document Analysis and Recognition (CEDAR)
- Center for Unified Biometrics and Sensors (CUBS)
LEED gold certificate
On April 4, 2012 it was announced that the building has been certified "Gold" by LEED. The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow:
- An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater
- A small green roof
- Waterless urinals
- Bicycle racks
- Constructed with recycled building materials
- Energy-efficient heating, cooling and ventilation systems
References
- ^ "Turner Construction Davis Hall project". Archived from the original on 2016-12-20.
- ^ "Davis Hall ribbon-cutting".
- ^ "Davis Hall Building". Archived from the original on 2013-12-24. Retrieved 2013-05-30.
- ^ "Davis Hall earns LEED gold for eco-friendly features".
- ^ "New UB Engineering Building". Archived from the original on 2013-06-07.
- ^ Center of Excellence for Document Analysis and Recognition (CEDAR)
- ^ Center for Unified Biometrics and Sensors (CUBS)