Batang Kali Railway Station
It was the second stop in the Rawang-Tanjung Malim shuttle service (formerly known as the Rawang-Kuala Kubu Bharu shuttle service) until the service merged with the Port Klang Line in 2016.
The station, as are all the other stations along the shuttle route (except the Tanjung Malim Komuter station), is situated along two railways, each assigned with one platform like most station halts along KTM Komuter lines, but contains facilities normally reserved for medium-to-large stations along three or more lines. In addition to ticketing facilities and basic amenities, the station contains spaces for administrative occupants, as well as a "kiosk" and an additional foot bridge (fused with a foot bridge exclusively for Komuter users) for pedestrians that simply intend to cross the railway lines. The station also includes low-tech support for disabled passengers. The station exits southeast towards a road that passes through Batang Kali.
The Batang Kali station's two side platforms are designated as platform 1 (adjoining the main station building at the east, intended for southbound trains) and platform 2 (at the west, intended for northbound trains).
See also
References
- "KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. 2007-04-21. Archived from the original on 2007-08-10. Retrieved 2007-05-03.
3°28′06″N 101°38′17″E / 3.46833°N 101.63806°E