The plant consists of two nearly identical units, launched into operation in 1974 and 1975. Each furnace, a Babcock & Wilcox boiler, heats steam to 1,000 °F (538 °C) in both the secondary superheater and reheater sections. The boilers are supercritical units, operating at 3,400 pounds per square inch (230 atm) of pressure. All four generators (two low pressure generators and two high pressure/intermediate pressure generators) are Westinghouse generators. The low pressure, intermediate pressure and high pressure steam turbines were originally Westinghouse units, but were replaced over time with Alstom steam-path upgraded components. The turbine valves are the originally installed Westinghouse equipment.
The plant employs multiple pollution control systems, including a selective catalytic reducer which removes nitrogen oxides, an electrostatic precipitator which removes fly ash, and low NOx burners in the boiler. The plant has completed a $500 million flue-gas desulfurization project which came online during the beginning of 2008. This project has reduced the plant's sulfur dioxide emissions by 95%.
See also
References
- ^ "Electricity Data Browser - Belews Creek". www.eia.gov. Retrieved 2020-02-09.
- ^ "Existing Electric Generating Units in the United States, 2006" (Excel). Energy Information Administration, U.S. Department of Energy. 2006. Archived from the original on 16 June 2008. Retrieved 2008-07-14.