Bellevue Bridge
The bridge formerly connected Nebraska Highway 370 and Iowa Highway 370. Both routes were truncated upon the completion of the US 34 bridge downstream.
The bridge was built in 1950 by the Bellevue Bridge Commission at a cost of $2.8 million (equivalent to $35.5 million in 2023). The bridge charges $1 tolls for cars and is 20 feet (6.1 m) wide. The bridge is considered obsolete, however there are plans to replace it in the coming decade. Various government entities have sparred over ownership, due to the expense of maintenance, after the initial bonds were paid off in 2000. The issue has been temporarily resolved since the Bridge Commission has had to seek more than $1 million in bonds for repairs to the bridge.
See also
External links
41°8′19″N 95°52′45″W / 41.13861°N 95.87917°W