Bhartiya Rail Bijlee Company Limited
In 1989, the Chief Minister of Bihar and veteran leader Satyendra Narain Singh conceived the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to Rajiv Gandhi, the Prime Minister of India and Congress leader. However, the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it. The joint venture agreement was signed on 6 November 2007 and the company was incorporated on 22 November 2007. Commercial generation started from Unit-1 and 2 (2X250MW) of Bharatiya Rail Bijli Company Limited in 2016.
Need for the plant
The railways need the plant because of the demands of a globalising economy and mega projects of the Railways such as the planned Dedicated Freight Corridors across the country. The electricity from this plant will be utilized by Indian Railways for running electric trains in Bihar, Jharkhand, West Bengal, Chhattisgarh, Maharashtra, Gujarat and Madhya Pradesh in the eastern and western regions of the country. The Union Cabinet of India has, in view of the high tariff charged by State Electricity Boards, approved the railways' proposal for using direct power supply from Central generating agencies from the 15 per cent unallocated central share of power. Railways are saving about Rs. 50 crore per annum due to implementation of these schemes for using direct power supply from NTPC/Central generating agencies. EPC is being undertaken by public sector major BHEL.
Location
The project site is situated on a state highway which is 25 km south of NH-2 from Barun, 9 km from ‘Nabinagar Road’ Railway Station and 100 km from Gaya Airport.
Inputs
Water requirement for the project is 60 cubic feet per second which is allocated from the upper stream of the Sone River (Indrapuri Barrage). Coal requirement for the project is 5 MTPA. The coal linkage of 5 MTPA has been accorded from Pachra & Pachra south block, North Karanpura Coalfield of Central Coalfields Limited which is approximately 215 km from the project site.
Beneficiaries
The beneficiaries for the power generated from NTPC are Indian Railways (90%) and Bihar State (10%). PPA has been signed with both of the beneficiaries.
Installed capacity
Unit | Capacity (In MW) | Date of Commissioning | status |
---|---|---|---|
1 | 250 | 2016 March | Commissioned |
2 | 250 | 2017 April | Commissioned |
3 | 250 | 2019 February | Commissioned |
4 | 250 | 2021 December | Commissioned |
See also
References
- ^ "High drama in power-plant row". www.telegraphindia.com. Archived from the original on 7 December 2017.
- ^ "Protest stalls power plant". www.telegraphindia.com. Archived from the original on 7 December 2017.
- ^ "S N Sinha's brainchild NTPC project gets approval". Hindustan Times. India. Archived from the original on 5 June 2011. Retrieved 23 February 2007.
- ^ "PM DR Manmohan Singh Approves NTPC Project in Bihar Promised by Then CM SN Sinha". Hindustan Times. India. Archived from the original on 5 June 2011. Retrieved 23 February 2007.
- ^ "First unit of NTPC-Rail JV synchronised at Bihar's Nabinagar". Business Standard India. Press Trust of India. 20 March 2016.
- ^ "Aurangabad power plant unit to be commissioned in September". The Times of India.
- ^ "Press Information Bureau".
- ^ "Nabinagar Thermal Power".
- ^ "BHEL commissions 250 MW thermal plant in Bihar and other Top Corporate News of the day".
- ^ "NTPC commissions 250 MW unit of Bhartiya Rail Bijlee Co".
- ^ "BHEL Commissions Third 250-MW Unit at Nabinagar Power Plant in Bihar".