Bo'ai Zhonglu Station
History
When Line 3 was approved in 2012, this station was known as Shishan Dong (E), and it was an elevated station and the northern terminus of the line. In 2013, Line 3 was decided to extend from this station to the north, and the station became an intermediate station. In 2015, the station was changed to an underground station and renamed Shishan. In 2022 the station name was adjusted to Bo'ai Zhonglu.
The construction of the station officially started on November 18, 2016, and the groundbreaking ceremony of Line 3 was also held at the station on that day. On October 4, 2017, the first floor of the station was successfully poured, which laid the foundations to enter the construction stage of the main structure.
On December 25, 2018, the main structure of the site was successfully capped. On October 18, 2023, this site took the lead in launching comprehensive joint commissioning.
Station layout
The station has an island platform under a planned road. The station has a double line to the north that connects to Shishan Depot.
G | - | Exits B-E |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform 1 | 3 towards Foshan University (Nanhai University Town) |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Lianhe (Kesheng Lu) |
Exits
The station will have a total of 5 exits, lettered A-E, which will be located on the east and west sides of a planned road. In its initial opening, the station opened Exits B-E.
Exit letter | Exit location | |
---|---|---|
B | Keyuan Road, Shishan Industrial Boulevard North | |
C | Middle Bo'ai Road, Shishan Industrial Boulevard North | |
D | Middle Bo'ai Road, Shishan Industrial Boulevard North | |
E | Middle Bo'ai Road, Shishan Industrial Boulevard North |
Future development
In the future, this station will become an interchange with Line 8. Line 8 is a long-term planning line, which is planned to be set underneath Middle Bo'ai Road and intersect with Line 3. During the partial construction of Line 3 of this station, the transfer interface was reserved at the concourse level.
Notes
- ^ It is a different station to Shishan railway station on the Guangzhou-Zhaoqing Intercity Railway, the two stations are not alike
References
- ^ 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-22 – via Foshan Municipal People's Government.
- ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-22.
- ^ 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
- ^ 李传智 (2013-06-07). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [The second environmental impact assessment announcement for Metro Line 3 was released: Line 3 will transfer with 7 metro lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-25. Retrieved 2024-08-22 – via Sina Corporation.
- ^ 李传智; 何超 (2015-07-22). "最长地铁线串起14条轨道线" [The longest subway line connects 14 rail lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-29. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ 吴琦媛 (2019-04-26). "佛山西站傍身5条地铁规划导入" [Foshan West Station is adjacent to 5 subway lines]. Foshan Daily (in Simplified Chinese). Archived from the original on 2022-08-07. Retrieved 2024-08-22.
- ^ 曾群善; 冯雷亮 (2016-11-18). "佛山最长地铁3号线全线动工" [Foshan's longest metro line 3 starts construction]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2016-11-19. Retrieved 2024-08-22.
- ^ 周龙凤 (2017-10-05). "首块底板浇筑成功庆佳节" [The first base slab was poured successfully to celebrate the festival]. Foshan Daily (in Simplified Chinese). Archived from the original on 2022-08-07. Retrieved 2024-08-22.
- ^ 区辉成 (2018-12-27). "狮山站顺利封顶!佛山地铁三号线进展如何?速围观" [Shishan Station has been successfully capped! How is the construction of Foshan Metro Line 3 progressing?]. Zhujiang Times (in Simplified Chinese). Archived from the original on 2022-08-07. Retrieved 2024-08-22.
- ^ 许力夫 (2023-10-18). "佛山地铁建设按下加速键,地铁三号线后通段综合联调在博爱中路站启动" [Foshan Metro construction presses the acceleration button, and the comprehensive joint commissioning of the rear section of Metro Line 3 is launched at Middle Bo'ai Road Station]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2023-10-18. Retrieved 2024-08-22.
- ^ "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 2024-08-20. Archived from the original on 2024-08-20. Retrieved 2024-08-22 – via Official NetEase account.
- ^ "博爱中路". Foshan Metro (in Simplified Chinese). Foshan Metro.
- ^ "佛山市城市轨道交通三号线工程狮山站主体建筑批前公示" [Public notice before approval of the main building of Shishan Station of Foshan Urban Rail Transit Line 3]. 佛山市南海区人民政府. 2022-08-05.
External links
- Station information: 博爱中路