Brant Street Pier
The pier is the final phase of the Downtown Waterfront Project: expansion of the Art Gallery of Burlington, construction of the 380-vehicle Locust Street parking facility, and opening of Discovery Landing.
Construction
The construction of the pier began on 2006 with a budget of $6.9 million. After a series of delays and issues, the pier opened in June 2013. A well-known philanthropist, who was going to donate a $10 million sculpture Untitled (Head Through Belly), pulled out of the deal after locals opposed to it. Construction for the summer in 2008 was stopped because a crane fell into Lake Ontario. Later, the majority of the pier's reinforcement beams had to be fixed because they were found to be lacking in foundation. In 2012, the city council decided to remove a large wind turbine from the structure. The proposed plan for the length of the pier was supposed to be 100 meters more than the constructed. The city settled their legal disputes in 2014 with the original contractor, Harm Schilthuis and Sons Ltd., and engineering firm Aecom Canada Ltd. Final costs to the city were estimated at $14.4M.
Features
The S-shaped pier is 137 metres long and about 7.5 metres wide along the span or deck. It features a walkway and lighted lookout tower elevated four meters above the deck. The lookout tower or the raised platform, accessible by a circular staircase, is located on the fifth span of the deck (a circular node with a diameter of 20m). This raised platform also supports a 12-metre beacon made of tubular structural steel framing on the center.
The pier, as part of Spencer Smith Park, is open between 7 a.m. and 11 p.m. The pier is not maintained during winter, which is why it is not suggested to go to the pier during this season, especially in harsh and extreme weather. The pier is not open for motorized vehicles, except for city maintenance vehicles. At this time, there is no docking feature yet on the pier; although the City Council is intending to add one on later dates. Fishing and biking are allowed on the pier and park. Climbing, diving or swimming is not permitted on the pier, as well as skateboarding on benches and rails. Alcoholic beverages are not allowed on the pier.
The maximum number of people safely permitted on the pier is 2,100.
Lasting Impressions: Handprints on the Pier
In October 2012, the city opened an opportunity for children across Burlington to leave their hand prints on the pier. The city received 444 entries, drawing one name from each of the six wards and a seventh name from the city at large. The city then took the hand print impressions of the seven children as part of leaving their legacy with the Brant Street Pier. The children returned to help unveil the plaque that contains the lasting impressions of their handprints on the opening ceremony held last June 2013.
Gallery
-
The wallkway and the beacon from the pier
-
View of the pier from Spencer Smith Park
-
The beacon
-
Downtown Burlington on the background
-
Brant Street Pier on Canada Day
References
- ^ "Brant Street Pier". www.burlington.ca. Retrieved 2015-09-14.
- ^ Little, Joan (2014-02-12). "Long and winding road to Burlington's pier". Simcoe.com. Archived from the original on 2022-01-10. Retrieved 2022-01-10.
- ^ "$2 million deal ends Burlington saga of 'mistake on the lake'". The Hamilton Spectator. 2014-06-23. Retrieved 2015-09-14.
- ^ Forani, Jonathan (2014-06-23). "The city of Burlington has received a $2 million settlement for the long-delayed Brant Street Pier, which cost the city some $14.4 million and seven years of agony". The Toronto Star. ISSN 0319-0781. Retrieved 2015-09-14.
- ^ "Lasting impressions from the people that will end up paying for the pier that is far from on time and even further from being on budget". Burlington Gazette. Retrieved 2015-09-14.