Brent Cross West Railway Station
History
Brent Cross Cricklewood development
Construction is underway for Brent Cross Cricklewood, a 14,000,000 square feet (1.3 km) development of a new town centre in Brent Cross. The plan includes the new station, expanding jobs by around 27,000, building 7,500 homes, expanding Brent Cross Shopping Centre, a new hotel, cinema, a new bus station, and new roads.
Cricklewood station
The developers of the Brent Cross Cricklewood development have included in their project a plan to upgrade facilities at Cricklewood railway station which lies 1.5 kilometres (0.93 mi) south of the Brent Cross station site. The platforms at Cricklewood cannot accommodate longer 12-car trains, but the new Brent Cross platforms can accommodate the longer trains. Rumours that Cricklewood station would close when the new station opened were refuted by the development company.
Construction
On 23 December 2019, VolkerFitzpatrick signed a contract with Barnet Council to design and build the station. Planning permission was granted by Barnet London Borough Council in May 2020. Work to clear the site began in June 2020 and construction of the foundations began in November 2020.
On 22 June 2023, it was announced that the station had passed essential platform tests and that an opening date was being planned for the following Autumn.
On 10 November 2023, it was announced that the station would be opening to passenger service on 10 December 2023.
Location
The station is on the former site of the Cricklewood TMD (traction maintenance depot) which is used by East Midlands Railway and Thameslink, between existing Cricklewood and Hendon stations. The depot was moved slightly south onto a bigger site.
Following the expansion of the Thameslink network under the Thameslink Programme, longer 12-carriage trains from south of the River Thames are now able to operate on the northern section and Brent Cross station was constructed with longer platforms that can accommodate the longer train formations.
Further plans
West London Orbital | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Proposed route
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
In 2017 a proposal to extend the London Overground network to Hendon via Brent Cross West was announced by the London Assembly and Transport for London. The scheme, known as the West London Orbital envisages re-opening the Dudding Hill Line to passenger services and running trains from West Hampstead Thameslink and Hendon to Hounslow via the planned Old Oak Common Lane station. The plans are currently at public consultation stage with TfL, although enabling works to make the station compatible with a future upgrade have been delayed.
An earlier proposal to construct a light rail system serving Brent Cross, Harlesden and Brent Cross tube station was put forward in 2010, but the scheme, known as the North and West London Light Railway, did not go ahead.
Services
All services at Brent Cross West are operated by Thameslink using Class 700 EMUs.
The typical off-peak service in trains per hour is:
- 4 tph to St Albans City (all stations)
- 2 tph to Luton (all stations except Hendon)
- 2 tph to Rainham via Dartford
- 4 tph to Sutton (2 of these run via Mitcham Junction and 2 run via Wimbledon)
During the peak hours, the station is served by additional services between Luton and Orpington via Catford, as well as some late evening services to and from Bedford.
The station is also served by a night service between Bedford and Three Bridges on Sunday to Friday nights.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Thameslink |
Connections
London Buses routes 189 and 316 serve the station.
Gallery
-
Eastern entrance
-
Footbridge
-
Platform 1
-
Platform 2
-
Western entrance
References
- ^ "Brent Cross West Station | National Rail". www.nationalrail.co.uk. Retrieved 25 October 2023.
- ^ "The New Station". Transforming Brent Cross Cricklewood. Retrieved 26 July 2023.
- ^ Brent Cross Cricklewood: The benefits Archived 8 July 2011 at the Wayback Machine Accessed 20 December 2010
- ^ "Brent Cross West". Barnet Council. Retrieved 13 November 2022.
- ^ Ahdash, Hajer (10 November 2023). "Brent Cross West opening date announced". Transforming Brent Cross Cricklewood. Retrieved 11 November 2023.
- ^ Floyd, David (11 December 2023). "Opening of Brent Cross West Station hailed as "major milestone" for area". Barnet Post. Retrieved 28 September 2024.
- ^ "Brent Cross: Better Transport" (PDF). Archived from the original (PDF) on 6 August 2010.
- ^ "Thameslink Programme - FAQ". Archived from the original on 6 February 2009. Retrieved 21 November 2008.
- ^ Brent Cross Cricklewood: Myths about the project Archived 8 July 2011 at the Wayback Machine Accessed 20 December 2010
- ^ "Housing and Growth Committee Brent Cross Cricklewood Update Report" (PDF). 27 January 2020. Retrieved 12 March 2022.
- ^ "Foundations milestone at new Brent Cross railway station". 10 November 2020.
- ^ Ahdash, Hajer (22 June 2023). "Next Stop: Brent Cross West". Transforming Brent Cross Cricklewood. Retrieved 11 November 2023.
- ^ Ahdash, Hajer (10 November 2023). "Brent Cross West opening date announced". Transforming Brent Cross Cricklewood. Retrieved 11 November 2023.
- ^ Brent Cross Crickelwood: Transport Archived 29 March 2010 at the Wayback Machine Accessed 20 December 2010
- ^ "Thameslink Programme: FAQs - Why aren't Kentish Town and Cricklewood platforms being extended?". Archived from the original on 6 February 2009.
- ^ "Mayor's Transport Strategy 2018". London City Hall. 5 January 2015. Archived from the original on 26 July 2019. Retrieved 26 July 2019.
- ^ "West London Orbital". Transport for London. Archived from the original on 25 July 2019. Retrieved 30 July 2019.
- ^ "Setback for West London Orbital railway plans". ianVisits. 22 September 2020. Retrieved 27 November 2022.
- ^ Table 52 National Rail timetable, December 2023
- ^ "Brent Cross West Station". TfL. Retrieved 11 December 2023.
External links
- Train times and station information for Brent Cross West railway station from National Rail
- "Brent Cross London: The Wider Masterplan". brentcrosslondon.co.uk. Hammerson plc/Aberdeen Standard Investments. Retrieved 31 July 2019.
- "Take a preview of Brent Cross West station ahead of Sunday’s opening", 8 December 2023