Loading
  • 21 Aug, 2019

  • By, Wikipedia

Bromley North Railway Station

Bromley North railway station is in the London Borough of Bromley in south-east London, in Travelcard Zone 4. It is 10 miles 47 chains (17.0 km) down the line from London Charing Cross. The station and all trains serving it are operated by Southeastern. It is the terminus of the short Bromley North Branch Line from Grove Park.

History

The station was opened in 1878. It was extensively rebuilt by the Southern Railway in 1925-1926 by the Chief Architect to the Southern Railway, James Robb Scott.

The station entrance on Tweedy Road.

The building has been Grade II listed since 31 August 1990.

Services

Bromley North Line
Grove Park
Sundridge Park
Bromley North

Historical services

After opening the station trains had direct services to Holborn Viaduct, Victoria, London Bridge, London Cannon Street and London Charing Cross. From April 1976 this was cut back to a peak hour service before being withdrawn completely in 1990. In order to get from Bromley North to Central London passengers have to change at Grove Park.

Current services

All services at Bromley North are operated by Southeastern using Class 465 EMUs.

The typical off-peak service is two trains per hour to and from Grove Park, from where connections are available to London Charing Cross, London Cannon Street, Orpington and Sevenoaks. The service is increased to three trains per hour during the morning peak.

No services call at the station on Sundays or Bank Holidays.

Preceding station National Rail National Rail Following station
Southeastern
Monday-Saturday only
Terminus

Connections

Bromley North is a hub terminus for buses in outer southeast London, with 15 day routes (two of which are part of the Superloop express network), one 24-hour route and one night-operating route serving the station, of which 12 of the day routes terminate/commence at Bromley North.

London Buses routes 61, 119, 126, 138, 146, 227, 246, 261, 269, 314, 336, 352, 354, 367, SL3, SL5 and night route N3 serve the station.

Future proposals

Proposals have been put forward by Transport for London and the London Borough of Bromley for the Bromley North Line to be extended and connected to either the Docklands Light Railway via a link south of Lewisham, to the Tramlink system from Beckenham Junction, or to an extension of the Bakerloo line from Elephant & Castle. These schemes have not been taken beyond the proposal stage and recommendations were expected to be published around 2018.

Additionally, it has been suggested that the Bromley North Line could be connected to London Overground via an extended service from New Cross, although the problems of line capacity make this seem an unlikely solution.

See also