Campo Belo (São Paulo Metro)
It is operated by ViaMobilidade and belongs to Line 5-Lilac, which connected with the metropolitan network of São Paulo in September 2018 with the opening of stations Chácara Klabin, which connects to Line 2-Green, and Santa Cruz, which connects to Line 1-Blue. It was the last station to be delivered in the expansion plan of the line. The station will also, in the future, have a connection with Line 17 (São Paulo Metro) when opened.
According to the Metro original plans, the station should be named "Água Espraiada-Campo Belo", but, because of the change of name of Brooklin station of Line 5-Lilac, the station lost the sufix "Campo Belo". Later, it switched to Campo Belo, as both Brooklin and Campo Belo are located in the same borough.
On 26 March 2019, it was informed that the station opening could happen on 10 April.
On 5 April, it was confirmed the opening of the station to 8 April, two days before what was announced before. During the first 5 days, it worked in a reduced time, from 10 a.m. to 3 p.m., and on 13 April it began working in full time.
Characteristics
The Line 5 station is in the underground, composed of 5 drying pits of great diameter, with structure in apparent concrete and main access roof with a steel and glass dome, for natural lighting. It has one access, with escalators in both ways and 3 preferential elevators for disabled and reduced mobility people. It has mezzanine with ticket offices and commuters distribution, besides the central platform.
Station layout
P Platform level | ||||
Westbound | ← toward Morumbi | |||
Island platform, doors open on the left | ||||
Eastbound | toward Aeroporto de Congonhas/Washington Luis → | |||
M | Mezzanine | Fare control, ticket office, customer service, Bilhete Único/TOP recharge machines, future transfer between and | ||
G | Street level | Exit/entrance | ||
M | Mezzanine | Fare control, ticket office, customer service, Bilhete Único/TOP recharge machines, future transfer between and | ||
P Platform level | ||||
Northbound | ← toward Chácara Klabin | |||
Island platform, doors open on the left | ||||
Southbound | toward Capão Redondo → |
References
- ^ Meier, Ricardo (1 December 2023). "Linha 17-Ouro aparece com inauguração prevista para junho de 2026". Metrô CPTM (in Portuguese). Retrieved 10 January 2024.
- ^ "Governo entrega estação Campo Belo e conclui ampliação da Linha 5-Lilás" (in Portuguese). Portal do Governo de São Paulo. 8 April 2019. Retrieved 25 May 2019.
- ^ "Com atraso de mais de 4 anos, estação Campo Belo da Linha 5-Lilás do Metrô é inaugurada" (in Portuguese). G1. 8 April 2019. Retrieved 25 May 2019.
- ^ Bonini, Victor (14 February 2018). "Metrô de SP adia novamente inauguração de estações da Linha 5-Lilás" (in Portuguese). G1. Retrieved 25 May 2019.
- ^ Galfo, Fernando (26 March 2019). "Estação Campo Belo da Linha 5 Lilás poderá ser inaugurada dia 10/04" (in Portuguese). Ferroviando. Retrieved 25 May 2019.
- ^ Galfo, Fernando (5 April 2019). "Metrô confirma Estação Campo Belo para 08/04" (in Portuguese). Ferroviando. Retrieved 25 May 2019.
- ^ Bazani, Adamo (8 April 2019). "Horário inicial de operação da Estação Campo Belo da linha 5-Lilás será das 10h às 15h" (in Portuguese). Diário do Transporte. Retrieved 25 May 2019.
- ^ Lobo, Renato (8 April 2019). "Estação Campo Belo, da Linha 5-Lilás, terá horário integral no sábado (13)" (in Portuguese). ViaTrolebus. Retrieved 25 May 2019.
- ^ "Estação Campo Belo" (in Portuguese). ViaMobilidade. Archived from the original on 11 April 2019. Retrieved 25 May 2019.