The wind farm's groundbreaking took place on September 3, 2013, initially planned that the plant be connected to the national grid by June 2014. The wind farm was fully commissioned by the Energy Regulatory Commission on November 11, 2014, and was later inaugurated on November 19 of the same year. The wind farms has 27 individual wind turbines occupying a 625 hectare land area. AC Energy Holdings Inc. planned to increase the wind farms capacity to 81 MW (Safety Factored) by 2015.
Residents belonging to at least 10 families living in barangays Malasin, Abaca, and Dadaur of Bangui, Ilocos Norte protested the installation of a 69 km transmission line, which they claimed passes through their land, and demanded for the transmission line to be relocated.
References
- ^ Lazaro, Freddie (January 6, 2015). "Flashback 2014: It was year of wind farm projects in Ilocos Norte". Philippine Information Agency. Archived from the original on February 15, 2015. Retrieved February 15, 2015.
- ^ Adriano, Leilanie (September 9, 2013). "81-MW wind farm to rise in Pagudpud". Ilocos Times. Retrieved February 15, 2015.
- ^ Adriano, Leilani (November 21, 2014). "Protest greets launch of another wind project". Wind Watch. Philippine Daily Inquirer. Retrieved February 15, 2015.