Development
The site where the convention centre now stands was originally intended for a sports complex to have been dubbed as the "Cebu Mega Dome". A contest was held for its design and the winning entry was the "spinning disc" by Architect Alexus Medalla. The project however was stalled after some members of the provincial board opposed it.
In late 2005, Philippine President Gloria Macapagal Arroyo decided that the province would host the 12th ASEAN Summit and 2nd East Asia Summit in December 2006, which was later moved to January 12–15, 2007, due to Typhoon Utor. The Philippines was supposed to host the twin summits in December 2007 but Myanmar, the original host for 2006, backed out. Since the province lacked a stand-alone convention centre with complete facilities for a large and prestigious international gathering like the ASEAN Summit, Cebu Governor Gwendolyn Garcia revived the "mega dome" project but with the design revised as a convention centre instead of a sports arena. The external structure would still be that of a "spinning disc".
A few weeks afterwards a new design was put forwards and was considered, since it was cheaper and easier to build (granting that it was smaller in size too) and that there was a time constraint that the Cebu Provincial Government had to stick to. Construction for the substructure began in April 2006 and work on the superstructure itself, which was largely made up of structural steel, glass and aluminum cladding, began three months after. The centre was finished four months later in late November and was officially inaugurated on January 6, 2007.
The building was closed since the October 2013 Bohol earthquake, having suffered major damage, it was further damaged by neglect and the wrath of both Typhoon Yolanda (Haiyan) in 2013, a month after the Bohol earthquake as well as Typhoon Odette (Rai) in 2021. Since then, the ramshackle building has fallen into a state of severe disrepair and has been overtaken by people within who were victims of a fire in nearby barangays Guizo and Mantuyong. Shacks were built within the area of the building that was once the parking lot.
Acquisition by the Mandaue City Government
The facility is owned by the Provincial Government of Cebu. In October 2016, it was announced that the City Government of Mandaue will be acquiring the CICC. The city government will pay the provincial government every year from 2016 until 2019. The four payments will amount to about ₱350 million. Upon the first payment by the city government, the convention center will be transferred to the city government.
Facilities
The convention centre features an International Media Center, a large Plenary Hall, an Exhibition Hall and several Meeting Rooms.
Photos
-
Outer view of the building.
-
Plenary Hall at the second floor.
-
Session Hall.
-
Damage pictured in 2023, almost 2 years after Typhoon Odette further ravaged the already-disused building.
References
- ^ "| Sun.Star". Archived from the original on 2016-03-03. Retrieved 2015-05-02.
- ^ Torre, AJ de la. "CICC closed over P32M quake damage". Philstar.com. Retrieved 2021-11-26.
- ^ Inquirer, Philippine Daily (2023-07-18). "BIZ BUZZ: Megaworld rides Cebu wave". INQUIRER.net. Retrieved 2023-11-17.
- ^ Quintas, Kristine B. "Until relocated: Fire victims to stay at CICC". Philstar.com. Retrieved 2023-11-17.
- ^ Cuizon (8 October 2016). "Mandaue City to take over Cebu International Convention Center". Sun Star Cebu. Retrieved 28 November 2016.