Chegongzhuang Station
Chegongzhuang station (simplified Chinese: 车公庄站; traditional Chinese: 車公莊站; pinyin: Chēgōngzhuāng Zhàn) is an interchange station on Line 2 and Line 6 of the Beijing Subway. The station is on intersection of Chegongzhuang Street and the West 2nd Ring Road. It provides direct access to Guanyuan Park.
Station layout
Both the line 2 and 6 stations have underground island platforms. Line 6 has a split island platform, whilst line 2 has a normal island platform.
Exits
There are 5 exits, lettered A, B, C, E, and H. Exits C and H are accessible.
Future Development
It will be the Southern terminus of Line 13A. Construction of Chegongzhuang station on Line 13A started on 20 April 2024.
Gallery
-
Line 2 platform
-
Line 2 platform in May 2010
-
Line 2 platform
-
Line 2 platform in December 2020
-
Stairs to exit C
-
Line 2 exit
-
Interchange to Line 6.
-
Passengers boarding a westbound line 6 train
-
Line 6 concourse
-
Line 6 platform
-
Eastbound line 6 platform
-
Eastbound line 6 platform with escalator to exits A, E, and H to the right
-
Eastbound line 6 platform in November 2016
-
Line 6 concourse
-
Line 6 train at Chegongzhuang station
-
Westbound line 6 platform facing east
-
Corridor to the eastbound line 6 platform
Notes
- ^ "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
- ^ "车公庄站(6号线)".
- ^ "车公庄站(2号线)".
- ^ "中铁十六局集团一周要闻(2024.4.15-4.21)". 2024-04-22. Archived from the original on 2024-06-11.
4月20日,地铁公司承建的北京轨道交通扩能提升工程13号线01标项目正式破土动工,标志着该工程进入实质性施工阶段
Wikimedia Commons has media related to Chegongzhuang Station.