City Centre Aquatic Complex
The City Centre Aquatic Complex is an indoor aquatic centre featuring an Olympic size swimming pool in the Town Centre area of Coquitlam, British Columbia. The building was designed by Vic Davies Architect Ltd., built at a cost of $8.2 million, and opened in March 1994. The pools use ozone for secondary water purification.