Congress Center Hamburg
History
The CCH was the first convention center in Germany. The government of Hamburg, including then-mayor Herbert Weichmann planned the center to promote tourism, being designed to attract the then-new concept of convention-goers. It was initially planned to be built in the Karolinenviertel neighbourhood, but this was rejected as it would lead to the destruction of extant buildings; instead, it was built in Planten un Blomen. The opening ceremony took place on 14 April 1973 with 3000 attendees, but the operators of the speaker system were absent, leading to "two hours of noise". The original design was criticised as a "bunker", but its relative lack of windows was liked by military representatives during the Cold War as they were afraid of spies.
After the building was opened, it was expanded multiple times to increase its capacity. Initially, this was controversial as the space intruded on the adjacent park. In 2000, the foyer and restaurant annex was overhauled, and in 2006, Hall H was opened, adding a roof garden to the complex.
A contest to overhaul the CCH was undertaken in 2014, which was won by Tim Hupe Architects; it was initially projected to cost 194 million euros. In 2017, it was discovered that the center was contaminated with polychlorinated biphenyls and asbestos, necessitating further work. The renovation involved adding capacity to the building and overhauling much of the rooms. Although many parts were completely renovated, the heritage-listed brick walls of the main theater and aluminium "jug lights" were retained. The old foyer was replaced with a new multi-storey one with large glass windows that contains the largest pendant light in the world. A passage was added parallel to the halls to allow different users to occupy them concurrently. The renovated center opened in 2022, at an increased cost of 297 million euros, caused by the asbestos contamination and COVID-19 pandemic.
Events
The CCH has hosted multiple back-to-back years of the Chaos Communication Conference and Eurofurence. It has also been home to many political party conferences, including speeches by Helmut Kohl, Angela Merkel, Willy Brandt, and Helmut Schmidt.
In addition to trade congresses and conventions, it has also hosted concerts by Queen, ABBA, Hans Zimmer, and Deep Purple. Udo Jürgens had a bathtub installed in one of the cloakrooms, as he did not like showering.
Location and capacities
The CCH is near the Planten un Blomen, the University of Hamburg, and the Hamburg Dammtor station. It is directly connected to the Radisson Blu Hotel Hamburg, which was opened in 1973 and renovated in 2009.
The building has a total capacity of 105,000 square metres (126,000 sq yd), has over 50 rooms, and accommodates up to 12,000 people. The perennial roof garden on the top of Hall H is the largest in Europe.
Venue | Capacity |
---|---|
Hall 1 | 2,680 |
Hall 3 | 1,910 |
Hall 4 | 672 |
Hall G | 1,058 |
Hall X | 1,338 |
Hall Y | 1,338 |
Hall Z | 820 |
Hall H | 6,930 |
The center is operated by Hamburg Messe und Congress, which also operates the Hamburg Messe.
See also
References
- ^ "Congress Center Hamburg: Neue Moderne im 70er-Jahre-Bau - ohne Udo Jürgens' Badewanne". Norddeutscher Rundfunk (in German). 3 April 2024. Retrieved 19 September 2024.
- ^ "Der lange weg in die krise". Die Neue Heimat (PDF). Materialien für die politische Bildung und die Demokratiebildung (in German). Landeszentrale für politische Bildung Hamburg. 9 July 2019. Retrieved 19 September 2024.
- ^ Bellmann, Alwin. "Zwei Stunden Lärm aus defekten Lautsprechern" (PDF). Hamburger Abendblatt (in German). Archived from the original (PDF) on 4 May 2023.
- ^ "Historische Kontinuität - Kongresszentrum in Hamburg von Tim Hupe Architekten und agn Leusmann". BauNetz (in German). 17 May 2023. Retrieved 19 September 2024.
- ^ "Unter Planten un Blomen - Richtfest für CCH-Erweiterung in Hamburg". BauNetz (in German). 9 May 2006. Retrieved 19 September 2024.
- ^ "Erweitert - Grundsteinlegung für Umbau des „Hannover Congress Centrum". BauNetz (in German). 15 October 1998. Retrieved 19 September 2024.
- ^ "Sanierung des Kongresszentrums nach über fünf Jahren fertig". Süddeutsche Zeitung (in German). 26 April 2022. Retrieved 19 September 2024.
- ^ Gaßdorf, Ulrich (8 October 2014). "CCH mit Asbest verseucht — ab 2017 wird das Gebäude saniert". Hamburger Abendblatt (in German). Retrieved 19 September 2024.
- ^ "Wachgeküsst: Wie cool ist das "neue" CCH?". Norddeutscher Rundfunk (in German). 4 April 2024. Retrieved 19 September 2024.
- ^ Preuß, Olaf (3 August 2024). "Congress Center Hamburg: Der neue Treffpunkt der Hansestadt". Die Welt (in German). Retrieved 19 September 2024.
- ^ Horchert, Judith (27 December 2015). "32C3: Hackertreffen des Chaos Computer Clubs startet". Der Spiegel (in German). Retrieved 20 September 2024.
- ^ "Hackerkongress 33C3: Prügel im Parlament und ein Fahrstuhl zum Mond". Der Spiegel (in German). 27 December 2016. Retrieved 20 September 2024.
- ^ "Eurofurence Hamburg 2024". TradefairDates. Retrieved 20 September 2024.
- ^ "Home". Eurofurence 27 - Black Magic. Retrieved 20 September 2024.
- ^ "Große Pläne mit dem CCH". Haufe.de (in German). 6 June 2019. Retrieved 19 September 2024.
- ^ Sullivan, Paul (14 September 2016). "Radisson Blu Hotel, Hamburg". The Telegraph. Retrieved 19 September 2024.
- ^ "At a glance". Congress Center Hamburg. Retrieved 19 September 2024.
- ^ "Profil | Daten und Fakten zur Hamburg Messe und Congress". Hamburg Messe + Congress (in German). Retrieved 19 September 2024.