D11 Motorway (Czech Republic)

The D11 motorway (Czech: Dálnice D11) is a motorway in the Czech Republic. It is part of European route E67 Via Baltica from Prague in the Czech Republic, to Helsinki in Finland, passing towns and cities in Poland, Lithuania, Latvia and Estonia.

Three lanes in each direction are planned by 2025 between Prague and Jirny (8 km) and to Poděbrady after 2025. Around Hradec Králové, the D11 runs in parallel with the D35 (between the Sedlice and the Plotiště interchanges).

History

Plans to build a highway connecting Prague and Hradec Králové date from 1938. Construction began in 1978, with sections 1101 (Prague-Jirny) and 1102/I (Jirny–Bříství) put into operation in October 1984. The second oldest 8.2-kilometre-long (5.1 mi) section, 1102/II (Bříství–Třebestovice) was put into operation a year later, in October 1985.

In 2009, the connecting section of the D35 motorway Sedlice (MÚK with D11) - Opatovice nad Labem (MÚK with I/37) was put into operation. This significantly accelerated the connection to Pardubice and the southern parts of Hradec Králové.

In 2017, the motorway was finally brought to Hradec Králové. In 2018 and 2019, there was an expansion to 6 lanes between Horní Počernice and Jirny, but only four lanes are still in use.

Sections between Hradec Králové - Smiřice and Smiřice - Jaroměř, which construction started in 2018, were opened in December 2021.

Future plans

As the S3 expressway connecting the Polish side was completed before the Czech D11, there are plans to complete the D11 to the Polish border. Almost all the land for section 1109 (Trutnov - state border with Poland) has already been purchased. Construction was originally scheduled to start at the end of 2023, and the contractor was selected in November 2023. However, a month later, an objection was filed against the selection of the most advantageous bid. This final section is yet to be started, with completion expected in 2027 at earliest.

Section 1108 Jaroměř – Trutnov; a 19.6-kilometre-long (12.2 mi) segment is planned. The construction should commence in 2025, in order to be put into operation in time for 2028.

After the completion of the Polish S3, the border section of D11 and the transfer of international traffic E65 and E67 from Harrachov and Náchod to Královec, problems are expected on road 37.

Route description

CountryRegionLocationkmmiExitNameDestinationsNotes
Czech RepublicPraguePrague00.0Kilometrage starting point
10.62Dálniční křižovatka Horní Počernice D 0 E67
Rest areaOdpočívka Beranka
Central Bohemian RegionCentral Bohemian Region85.0Jirny
1811Bříství
Rest areaOdpočívka Bříství
2516Sadská
3522Vrbová Lhota
Rest areaOdpočívka Vrbová Lhota
3924Kluk
4226Libice
4025Dobšice
Hradec Králové RegionHradec Králové Region6239Chlumec nad Cidlinou
6842Chýšť
7647Pravy
Rest areaOdpočívka Osice
8452Dálniční křižovatka Sedlice D 35 E442
9056Kukleny
9559Dálniční křižovatka Plotiště D 35 E442 I/11 I/35
10465Smiřice I/33
10867Jaroměř-jih I/33 E67
11370Jaroměř-sever I/37Temporary end of the motorway (other sections in preparation)
11773Choustníkovo HradištěIn preparation
12376KocbeřeIn preparation
Rest areaOdpočívka BrusniceIn preparation
13483StřítežIn construction, planned for 2028
14087PoříčíIn construction, planned for 2028
14087PoříčíIn construction, planned for 2028
Rest areaOdpočívka BernarticeIn construction, planned for 2028
15294KrálovecIn construction, planned for 2028
15294KrálovecIn construction, planned for 2028
15496Královec/Lubawka border crossing S 3 E67In construction, planned for 2028

Kilometrage end point


Border crossing; road continues as the Polish S3
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Proposed
  •       Route transition
  •       Unopened

Images

References

  1. ^ "Přehledně: Kde stát připravuje šestiproudé dálnice. Vyrostou hlavně u Prahy". 21 May 2019.
  2. ^ "Na novém úseku dálnice u Hradce začal ostrý provoz, D11 teď měří 90 km" (in Czech). iDNES.cz. 2017-08-21. Retrieved 2025-01-23.
  3. ^ "Hotovo, hlásí stavbaři na rozšíření D11 u Prahy. Nový pruh ale zprovozní až za 4 roky". Aktuálně.cz. 2018-10-26. Retrieved 2025-01-23.
  4. ^ Šindelář, Jan (2020-08-17). "Smluvní dodatek: Dálnice D11 od Hradce po Jaroměř se otevře před Vánoci 2021" (in Czech). Zdopravy.cz. Retrieved 2025-01-23.
  5. ^ NEVYHOŠTĚNÝ, Jan (2023-12-08). "Zahájení stavby D11 do Polska se odsouvá. Po námitkách Dětí Země napadla tendr firma Metrostavu" (in Czech). Zdopravy.cz. Retrieved 2025-01-23.
  6. ^ "Dálnice D11, stavba 1109, Trutnov–státní hranice ČR/Polsko" (PDF). ŘSD. Retrieved 2024-10-11.
  7. ^ "Dálnice D11, 1108 Jaroměř–Trutnov" (PDF). ŘSD. Retrieved 2024-10-11.

Content in this edit is translated from the existing Czech Wikipedia article at cs:Dálnice D11; see its history for attribution.

50°6′59.62″N 15°12′9.01″E / 50.1165611°N 15.2025028°E / 50.1165611; 15.2025028