Danjiangkou Dam
In the 21st century, the Danjiangkou Dam became part of the South-North Water Transfer Project. In 2005–2009, its height was raised in order to increase the reservoir's capacity.
Heightening
Originally, the dam was 97 m (318 ft) tall and 2,494 m (8,182 ft) long. Since its heightening, the dam is now 111.6 m (366 ft) tall and 3,442 m (11,293 ft) long. The original crest elevation was 162 m (531 ft) and is now 176.6 m (579 ft). The increase in height will add 11,600,000,000 m (9,404,273 acre⋅ft) to the reservoir's capacity bring it to 29,050,000,000 m (23,551,218 acre⋅ft). Currently, the reservoir has a capacity of 17,450,000,000 m (14,146,945 acre⋅ft).
The dam's power plant also contains 6 x 150 MW turbine generators for an installed capacity of 900 MW. This will increase with the heightened reservoir.
See also
References
- ^ "Middle Route Project (MRP)". NSBD. Archived from the original on 30 October 2013. Retrieved 31 January 2011.
- ^ "Danjiang Reservoir" (in Chinese). SYIPTV.COM. Archived from the original on 30 October 2013. Retrieved 31 January 2011.
- ^ "Completed Dam crest heightening to 176.6 m" (in Chinese). Qinchu Network. Archived from the original on 5 February 2010. Retrieved 31 January 2011.
- ^ "Danjiangkou Hydropower Station". China Gate. Archived from the original on 13 August 2011. Retrieved 31 January 2011.