Dolores River Bridge
The bridge was designed by the Colorado Department of Highways and was fabricated by Midwest Steel & Iron Works. It was installed in 1952 by contractor Gardner Construction Company. It was located at milepost 15.22, 0.4 miles (0.64 km) east of Bedrock. Its structure was 129 feet (39 m) long and 25.1 feet (7.7 m) wide, with a main span of 125 feet (38 m) and a roadway width of 24 feet (7.3 m).
Dismantling and replacement
In 2014, inspectors discovered a crack in one of the bridge's main beams. The Colorado Department of Transportation (CDOT) then closed the bridge to traffic and installed a one-lane, temporary bridge. With the temporary bridge in place, the old bridge was dismantled, its pieces labeled and stored in a warehouse for possible future use as a footbridge or bike trail bridge. CDOT then constructed a new precast-concrete girder bridge, which opened to traffic in 2017.