East Laporte Street Footbridge
It was listed on the National Register of Historic Places in 1981.
Rehabilitation
In early 2023, a rehabilitation project was completed with the aim of extending the lifespan of the bridge structure to 30 years and reducing lateral deflections. Key components of the project included the replacement of timber decking with composite decking, as well as the replacement of floor-beams and stringers. The project also involved the removal of pack rust from exposed steel components, along with cleaning and painting. Pedestrian access was improved by updating the bridge approaches and installing new lighting along the railing and truss members for safety. Bank protection on the east bank of the Yellow River was replaced with new riprap, and similar measures were taken around each bridge pier and along the cut bank on the west side of the river.
See also
- East Laporte Street Footbridge
- Marshall County Courthouse (Indiana)
- Plymouth Northside Historic District
- Plymouth Southside Historic District
References
- ^ "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
- ^ "Indiana State Historic Architectural and Archaeological Research Database (SHAARD)" (Searchable database). Department of Natural Resources, Division of Historic Preservation and Archaeology. Retrieved 2016-05-01. Note: This includes Ronald D. Gifford (July 1980). "National Register of Historic Places Inventory Nomination Form: East Laporte Street Footbridge" (PDF). Retrieved 2016-05-01. and Accompanying photographs.
- ^ "East LaPorte Street Pedestrian Footbridge Rehabilitation Project". City of Plymouth. Retrieved 2023-05-31.