Ermenek Dam
Ermenek Consortium
Ermenek Dam was constructed by the Ermenek Consortium that was specially created for this project. Member companies of the Consortium are BM Muhendislik ve Insaat A.S. (pilot and leader of the civil group), Alpine Bau GmbH, Pöyry Energy GmbH (engineer), Alstom Austria AG (financial coordinator and leader of the E&M group), VA TECH HYDRO GmbH & Co. and Voith Hydro GmbH & Co.
The Consortium was also responsible for provision of full foreign financing for the project, under terms agreeable to the Turkish Treasury.
Erik Regulator and HEPP
The Ermenek Project also comprises a second power facility named Erik Regulator and HEPP, which is located on the Eric Creek that flows into Ermenek River. Erik Regulator takes water from 815,0m elevation, transmits it through the Erik Pressure Tunnel into the Erik Power Cavern. The power cavern has an installed power capacity of 2*4,455 MW (total 8,91 MW), thereby raising the Ermenek project total to 308,91 MW. Water discharged from the Erik Power Cavern feeds into the Ermenek Dam system at the Ermenek Valve Chamber.
See also
References
- ^ "Ermenek". Poyry. Retrieved 25 November 2011.
- ^ J. Linortner; S. Güven (2013). "Ermenek Dam and HEPP – Impounding of a huge reservoir; Social and environmental impacts".
- DSI Archived 2012-05-15 at the Wayback Machine, State Hydraulic Works (Turkey), Retrieved December 16, 2009
- Ermenek Dam Official Website, Retrieved October 20, 2010