Florence Bridge
On June 20, 2019, barges pushed by a tugboat struck the bridge in multiple places, causing visible damage. The bridge was closed for emergency repairs, and traffic was detoured over I-72.
Proposed Replacement
A Illinois 100/106, Florence Bridge, River Crossing Study was started in April 2016 by the state of Illinois, and was initially anticipated to take three years to complete. This study represents the Phase I, planning portion of the project, which provides preliminary engineering and environmental impact evaluation to guide the project in future phases of work. Phase I studies were scheduled for completion in fall 2020. The replacement of the Florence Bridge is included in the Illinois Department of Transportation's FY 2021-2026 Highway Improvement Program which includes funding for preliminary & construction engineering, archeology surveys, land acquisition, utility relocations and construction.
The state determined that the bridge, built in 1929, was both "structurally deficient" and "functionally obsolete".
IDOT has hosted three public hearing for the Phase I Study of the Illinois River Bridge at Florence, Illinois along the Scott/Pike County line, with the most recent held on Thursday, September 10, 2020, for the purpose of explaining the alternative alignments for the proposed replacement bridge.[1]
See also
References
- ^ Roberts, Jim (2019-06-20). "Florence bridge closed indefinitely". WGEM. Retrieved 2021-08-03.
- ^ "Illinois 100/106, Florence Bridge River Crossing". www.florencebridgestudy.com. Retrieved 2021-02-02.
- ^ "Illinois 100/106, Florence Bridge River Crossing". www.florencebridgestudy.com. Retrieved 2021-02-02.
External links
- Florence Bridge at Bridgehunter.com
- IDoT press release telling of bridge's reopening
- Newman, Jeff; Forest, Geoff (April 2014). "Up & At 'Em" (PDF). Modern Steel Construction: 24–26.