Fountain Inn High School
The L-shaped two-story building on a basement has exterior brick walls set on concrete footings. The original 800-seat auditorium has hardwood flooring on the main floor as well as the stage floor. The ceiling features period art deco style patterned panels and lights. The sides of the auditorium are covered in wood panels.
The building served as the high school for the town for only 17 years, until the construction of Hillcrest High School was completed just outside the town. In 1957 when the new high school opened, the building became Fountain Inn Elementary School until a new school was constructed in 1997. The building was purchased by the city from the Greenville County School District in 1999. As the Fountain Inn Center for Visual and Performing Arts, it served the city of Fountain Inn by featuring traveling acts, a resident orchestra, a theater company and an arts academy.
In 2013, the building was renamed the Younts Center for Performing Arts and began a multi-phase remodeling project that includes renovation to the theater, the lobby and the exterior.
A new high school has been built and opened in 2021.
References
- ^ "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
- ^ "Fountain Inn High School". Retrieved November 30, 2013.
- ^ "NRHP Nomination Form" (PDF) (PDF). Retrieved November 30, 2013.
- ^ "Stepping Out in Fountain Inn". Archived from the original on December 3, 2013. Retrieved November 30, 2013.