Frank E. Ratts Generating Station
Rising eight stories above the ground, the Ratts Station stood on a foundation that was an acre of concrete 4 feet (1.2 m) thick, extending to a depth of 6 feet (1.8 m) beneath the turbine generators and boilers. In addition to two concrete stacks, each 300 feet (91 m) high, the generating station was equipped with environmental controls and monitors; these included updated precipitators for the removal of fly ash to protect the air quality.
Most of the fuel for the facility was mined within a radius of 20 miles (32 km).
On December 29, 2014 Unit 2 of Frank E. Ratts facilities was shut down per consent decree.
Legal Settlement
In July 2010 an agreement was reached between the EPA and Hoosier Energy to reduce emissions that are regulated under the Clean Air Act. The agreement covers a civil penalty and a commitment to upgrade the air pollution at two power plants in Indiana, Merom Generating Station, and Frank E. Ratts Generating Station.
Per consent decree the Frank E. Ratts station was closed and idled/shut down completely. It was torn down during late 2016 and early 2017 and the site has been graded and seeded.
See also
References
- ^ "Existing Electric Generating Units in the United States, 2006" (Excel). Energy Information Administration, U.S. Department of Energy. 2006. Retrieved 2008-07-14.
- ^ Hoosier Energy Agreement Marks 20th Settlement Under EPA’s Power Plant Enforcement Initiative EPA July 23, 2010.