Garyville Refinery
Construction began in 1973 by ECOL, Ltd. Construction was completed in 1976, and the refinery was purchased by Marathon Oil Company. Since then, the refinery has been expanded on multiple occasions, most recently with the $3.9 billion Garyville Major Expansion (GME) Project, completed in 2009. This, along with subsequent debottlenecking, increased capacity by 234,000 barrels per day (37,200 m/d).
Garyville Refinery operations consist of crude distillation, hydrocracking, catalytic cracking, hydrotreating, catalytic reforming, alkylation, sulfur recovery, and coking. The facility primarily processes heavy sour crude oils to produce gasoline, diesel, asphalt, propylene, isobutane, propane, fuel-grade coke, and sulfur. Feedstocks are supplied via pipeline, truck, barge, rail, and ocean tanker.
The refinery employs 900 employees and 600 contract workers.