Loading
  • 21 Aug, 2019

  • By, Wikipedia

Godavari Sunrise Convention Center

Godavari Sunrise Convention Center (Nepali: गोदावारी सनराइज सम्मेलन केन्द्र) is the second largest convention center of Nepal. The assembly hall was constructed in 43 Ropanis (approx 21875 m)of land at a cost of NPR 810 million. The assembly hall has the capacity of 3000 people. The center was inaugurated by KP Sharma Oli in 2021.

Architecture and facility

The main building of the center has been designed as symbol of rising sun and occupies about 27% of total land. The main hall is 28 m high and has a capacity of 3000 people. There is garden with area of 16 Ropanis (8140 m) and has a parking area of 13 Ropanis (6614 m).

Construction

The building was scheduled to be built by November 12, 2020, but it was delayed due to COVID19.

It was constructed by KC-Samanantar JV.

See also

References

  1. ^ "PM Oli inspects under construction assembly hall in Godavari". GorakhaPatra. Retrieved 2021-05-15.
  2. ^ "PM Oli inaugurates Assembly Hall in Godavari". Candles Khabar. 2021-05-14. Archived from the original on 2021-05-14. Retrieved 2021-05-15.
  3. ^ "सम्मेलन केन्द्रको भर्चुअल उद्घाटन". Retrieved 2021-05-15.
  4. ^ "PM Oli inaugurating ICC building today". Khabarhub. Retrieved 2021-05-15.
  5. ^ "प्रधानमन्त्री ओलीले ४ बजे 'गोदावरी सम्मेलन केन्द्र'को उद्घाटन गर्ने". प्रधानमन्त्री ओलीले ४ बजे ‘गोदावरी सम्मेलन केन्द्र’को उद्घाटन गर्ने. Retrieved 2021-05-15.