Loading
  • 21 Aug, 2019

  • By, Wikipedia

Guanqiao Station

Guanqiao station (simplified Chinese: 官桥站; traditional Chinese: 官橋站; pinyin: Guānqiáo Zhàn; Jyutping: gun kiu zaam) is a future elevated station of Line 4 of the Guangzhou Metro. It will be located at Guanqiao Village (Chinese: 官桥村), Shilou Town (Chinese: 石楼镇), Panyu District, Guangzhou. The station began construction in December 2023 and will be completed by the end of 2026.

History

This station was originally a reserved station on Line 4. Because most of the surrounding areas of the station are farmland and there is no road to connect with the outside world, the station was not built simultaneously with Line 4, therefore only the equipment required for the signal system was installed at the predetermined location of the station, and no civil facilities for the station were reserved.

As construction of the Guangzhou–Huizhou intercity railway neared completion, the station started planning construction around 2020 to channel passengers onto the intercity line. The preliminary design estimate for the station project was approved in February 2021. The station was originally scheduled to start construction in the second half of 2021 and be completed and opened in 2024. As a result, the parties issued a supervision tender in October of the same year, but suspended the tender ahead of schedule in March 2022. In May 2022, the construction bidding supervision bidding was restarted again. In September 2022, the relevant person in charge said in response to media and public inquiries that the station has completed the bidding for the project and is carrying out preliminary work such as land acquisition, planning and construction approval.

In February 2024, the construction of the steel structure of the station began.

See also

References

  1. ^ "广佛南环、佛莞城际开通倒计时 换乘地铁需出闸或出站". 地铁官桥站正在建设,最快后年建成……最快有望2026年底建成
  2. ^ "四号线官桥站终于要建了,可换乘佛莞城际". dayoo.com. 2021-02-03. Archived from the original on 2021-02-13.
  3. ^ 李天研 (2021-02-03). "四号线官桥站终于要建了,可换乘佛莞城际" [Guanqiao Station on Line 4 is finally going to be built, and it can transfer to Foshan-Dongguan Intercity Railway]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2021-02-13. Retrieved 2024-08-04.
  4. ^ 徐振天 (2022-09-13). "广州地铁四号线官桥站何时能开工?" [When will the construction of Guanqiao Station on Guangzhou Metro Line 4 start?]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2022-09-12. Retrieved 2024-08-04.
  5. ^ "广州地铁4号线预留官桥站情况" [Guangzhou Metro Line 4 reserved Guanqiao Station]. People's Daily Leaders Message Board (in Simplified Chinese). 2022-10-21. Archived from the original on 2022-12-14. Retrieved 2024-08-04.
  6. ^ "广州市轨道交通四号线官桥站钢结构顺利吊装" [The steel structure of Guanqiao Station on Guangzhou Metro Line 4 was successfully hoisted]. Shanghai Baichuang Construction Engineering. 2024-03-02. Archived from the original on 2024-05-27. Retrieved 2024-08-04 – via Official WeChat Account.
  7. ^ "抢先试乘广佛南环!大湾区4条城际铁路即将贯通运营". 2024-05-15.