Haneji Dam
History
Planning for the dam was conducted in the late 1960s by the U.S. Army Corps of Engineers and construction on the dam began in 1981. Construction on the river diversion tunnels commenced in 1993 and work on the dam's body began in 1998. The body of the dam was complete in 2000 and the entire project in 2004.
Design
The dam is a 67 m (220 ft) tall and 198 m (650 ft) long rock-fill embankment type with a structural volume of 1,050,000 m (1,373,348 cu yd) and a crest elevation of 74 m (243 ft). The dam sits at the head of an 11 km (4 sq mi) catchment area and its reservoir has a surface area of 1 km (247 acres). The reservoir's capacity is 19,800,000 m (16,052 acre⋅ft) while 19,200,000 m (15,566 acre⋅ft) serves as active (or "useful") capacity. The dam is equipped with an uncontrolled chute spillway.
Innovations
The dam and its facilities are equipped with several innovations to improve water quality and the environment. Water in the reservoir is aerated using a dam energy-air system. Water discharged from the dam powers two small turbines which provide electricity for the operation of shallow and deep aerators. Given the height of the dam, a traditional fish ladder was not viable. An airlift system was developed which transfers fish through tubes in and out of the reservoir. The radial gate that controls the intake was split and reversed in design. This design takes advantage of tensile strength instead of compression strength which allows for a more compact and less costly design.
References
- ^ "Key Features of Dams in Okinawa". North Dam Construction Office. Archived from the original on 27 September 2011. Retrieved 24 July 2011.
- ^ "Haneji Dam" (in Japanese). Japan Dam Handbook. Retrieved 25 July 2011.
- ^ "New Technologies for Dam Construction". North Dam Construction Office. Archived from the original on 27 September 2011. Retrieved 26 July 2011.