Hantangang Dam
Construction
Construction started in February 2007 and was completed in mid-2015. K-water is responsible for planning and supervision. DL E&C (Daelim industrial.co. Ltd) was undertook the construction as a leading contractor. Not only to secure the stability against overflow during the flood season but also to reduce the construction cost through the mechanized construction fitting for the mega construction, the roller-compacted concrete (RCC) method has been applied. About 300 families will be displaced when the reservoir is filled.
This project also had a road project for the purpose of relocation of existing roads in Pocheon and Cheorwon areas that are submerged by the Hantangang Dam’s new flood water level. Relocation of roads project consists of a total of 27 km length and includes 11 large and small bridges within the roads. The newly relocated roads were built the flood water level high (EL.144m) along the National Route 87, Local Route 78, City Route 23, etc.
Design
The Hantangang Dam will be a 83.5 m (274 ft) and 690 m (2,260 ft) long gravity dam constructed of roller-compacted concrete. It has four spillways; a service, emergency, lower sediment discharge and eco-corridor. All four together will have a maximum discharge of 1,950 m/s (69,000 cu ft/s). The water storage capacity for the reservoir is 270,000,000 m (220,000 acre⋅ft).
References
- ^ "Circumference including three dams promote the final decision in the second half" (in Korean). Eco-Times. 13 June 2014. Retrieved 22 February 2015.
- ^ "Hantangang Dam". IndustryAbout. 28 December 2017.
- ^ "Flood Control Dam (Hantangang Dam)" (PDF). 29th Annual USSD Conference. Nashville, Tennessee: U.S. Society on Dams: 1351–1362. April 2009. Retrieved 22 February 2015.
- ^ "K-Water, Hantan River Flood Prevention Dam". 28 March 2011.