High Rise Bridge
Because of the high impact a bridge opening has on traffic, the bridge only opens on a 24-hour advanced notice unless the scheduled lift time is during the bridge's restricted hours of 6–9 am and 3–6 pm, when a three-day notice is required. The current reconstruction project intends to produce a fixed bridge with 100 feet (30 m) clearance, expected to significantly reduce traffic delays associated with bridge lifts.
History
On Wednesday November 10, 2010 after the 2:30 opening the bridge was stuck in the up position causing widespread traffic delays. It was later attributed to an electrical outage during a lift at 2:30 p.m.. That failure caused a malfunction in the bridge's lift mechanism which caused the bridge to not close completely. Engineers had to manually lower the span back together, and reopened the bridge some three and a half hours later, at 6:00 pm.
In 2016, the Commonwealth Transportation Board approved a $2.3 billion project that would eventually widen the corridor of I-64 that includes the bridge to eight lanes, and would replace the drawbridge with a 100 feet (30 m) fixed span bridge, initially planned for 135 feet (41 m), as part of the I-64 Southside Widening Project. As of October 2016, the plan is in Phase I, which would improve the corridor six lanes and build the new four lane Outer Loop bridge, which carries I-64 towards Chesapeake/Norfolk. The project is currently in Design–build status, and contract phase of 2017 has been completed and completion done in July 2022.