Hosa Road Metro Station
As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025 due to lots of trial runs along with more trainsets which are needed for commencement of operations.
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Hosa Road metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
Station Layout (TBC)
Hosa Road track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Bommasandra Next Station: Beratena Agrahara | |
Platform 1 Northbound |
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road Next Station: Singasandra | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exits
This section is empty. You can help by adding to it. (August 2023) |
See also
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
References
- ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
- ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
- ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
- ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
- ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
- ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
- ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 25 March 2017. Retrieved 23 October 2024.
External links
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.