Hsieh-ho Power Plant
History
The power plant started its operation after the commissioning of its first generation unit in January 1977.
Generation units
The power plant consists of four 500-MW generation units. The third 500-MW unit was finished on 19 December 1979 after a record-breaking construction period of 26 months. It went into operation in March 1980. The fourth 500-MW unit was completed in 1985 after 29 months construction period.
The units 1 and 2 were decommissioned on Dec. 31, 2019.
Components
The steam generator is rated at 1,701 tonne/hour, 176 kg/cm and 542 °C at superheater outlet and reheat to 542 °C.
The steam turbine is a tandem-compound with four flow exhaust, 3,600 rpm single reheat with throttle steam conditions of 166 kg/cm, 538 °C with reheat to 538 °C.
The stacks are 200 meters high slip-form reinforced concrete stack.
Transportation
Hsieh-ho Power Plant is accessible North from Keelung Station of Taiwan Railways.
See also
References
- ^ "Bureau of Energy, Ministry of Economic Affairs, R.O.C. - Energy Statistical annual Reports". Archived from the original on 2017-11-19. Retrieved 2014-12-13.
- ^ "Taiwan Info". Archived from the original on 2014-05-23. Retrieved 2014-05-23.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 2013-10-05. Retrieved 2013-05-18.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Gibsin Engineer, Ltd : Fossil Power Plant - Project Name : Hsieh-Ho Fossil Power Plant Unit" (PDF). Gibsin.com. Retrieved 2013-10-04.
- ^ "Hsieh-ho Power Plant". Taipower. Retrieved 2022-11-13.