Huguenot Tunnel
History
An idea for a tunnel through the Du Toitskloof Mountains was conceived in the 1930s but was put on hold due to the outbreak of World War II. The idea developed into a pass over the mountains, the Du Toitskloof pass, using the labour of Italian prisoners of war between 1942 and 1945 and continued with ordinary labour until its completion in 1948.
A 1983 economic impact assessment estimated that the construction of the tunnel would contribute R200 million to the economy of the Western Cape by 1988.
Geological surveys and design started in 1973, and excavation followed in 1984, tunneling from both ends using drilling and blasting.
The tunnel was named after the French Huguenot refugees that settled in the area in the late 1600s with one of the Huguenot refugees being Francois Du Toit, after whom Du Toitskloof was named.
Construction
The tunnel was designed by South African VKE and Swiss Electrowatt, Zurich consulting engineers.
There were two phases to the tunneling, the first a pilot tunnel to examine the route's geographical obstacles. The second phase bored a 5 m tunnel through granite rock as well as the construction of portals, drainage and ventilation tunnels. The two drilling heads met with an error of only 3 mm over its entire 3.9 km length. The tunnel was finally opened on 18 March 1988 and cost a total of R202.6 million (equivalent to US$95 million) to construct.
The tunnel is maintained by Tolcon, a subsidiary of the Murray & Roberts construction company. The tunnel was constructed by Hochtief and Concor.
Current plans
Currently the tunnel carries one lane of traffic in each direction. Plans are underway to open a second unfinished tunnel, the "northern bore", to carry eastbound traffic. This will allow for two lanes of traffic in each direction, with each tunnel carrying traffic in one direction only.
In 2002, traffic peaks occurred during Easter (a record on 26 April 18 200 vehicles) and the December school holidays (12 000 vehicles per day).
Toll
The toll as proclaimed on 1 March 2019 was (in South African Rand):
- Light Vehicles: R50.50
- 2-axle heavy vehicles: R131
- 3 and 4-axle heavy vehicles: R206
- 5 and more-axle heavy vehicles: R333
The tunnel has 13 video cameras that feed into an automatic incident detection system, which can sound alarm devices for any of the following conditions:
- Stopped vehicles
- Fast and slow-moving traffic
- Traffic queue
- Wrong-way driving
Sources
- Press release from the SA National Roads Agency
- Traficon NV Archived 11 March 2014 at the Wayback Machine
- ^ "Du Toit's Kloof Pass and the Huguenot Tunnel, Route 62 | South African History Online". www.sahistory.org.za. Retrieved 13 July 2023.
- ^ "Technical Committee D5 "Road Tunnel Operations"" (PDF). PIARC. 20 October 2017. p. 4. Retrieved 11 July 2023.
- ^ Nel, Brandon (16 April 2022). "Nearly 40 000 cars passed through Huguenot tunnel this Easter weekend". Weekend Argus.
- ^ "The Huguenot Tunnel turns 25 this week". The South African National Roads Agency. 19 March 2013. Retrieved 24 September 2017.
- ^ Clemence, Laurian. "Huguenot toll tunnel celebrates anniversary". www.engineeringnews.co.za. Retrieved 18 January 2023.
- ^ Ekron, Ziegfried. "Suprise [sic] plan for CT tunnel". News24. Retrieved 13 July 2023.
- ^ "Selected Historical Exchange Rates". South African Reserve Bank.
- ^ "Tolcon". Murray & Roberts. Archived from the original on 14 May 2010. Retrieved 23 July 2010.
- ^ Powell, Anel (8 September 2008). "Second tunnel for W Cape road link". Cape Times. Independent Newspapers. p. 1. Retrieved 11 August 2009.
- ^ "Transport master plan may cost R750bn". Business Day. 5 May 2010. Retrieved 5 May 2010.
- ^ "Here are all the new toll fees - including e-tolls". BusinessInsider. Retrieved 24 May 2021.