Illoulofin Solar Power Station

Illoulofin Solar Power Station, is a 50 megawatts (67,000 hp) solar power plant in Benin, whose first 25 MW was commissioned on 19 July 2022, and the next 25 MW is under construction and is expected to come online in 2025.

The solar farm is under development by the Government of Benin, with funding from the European Union (EU), the French Development Agency (AFD) and the Beninese Electricity Company (SBEE). The power station will be built in phases, with the first phase of 25 megawatts capacity followed by the second phase of equal magnitude. The energy from this solar plant will be integrated into the Beninese national electricity grid, during the 25 years of the solar farm's expected lifespan.

Location

The power station is located in the town of Pobè, in Plateau Department, in southeastern Benin, close to the international border with Nigeria. Pobè is located approximately 34 kilometres (21 mi), by road, north of Sakété, the capital of Plateau Department. This is approximately 103 kilometres (64 mi), northeast of Cotonou, the financial and business capital of Benin. The power station, whose construction began during the third quarter of 2021, sits on a piece of land measuring 96 hectares (240 acres), provided by SBEE.

Overview

The first phase of this power station, comprises 47,212 crystalline PV panels, each rated at 530 Watts, for a generation capacity of 25.02 megawatts. The energy generated here is evacuated via a 20kV medium-voltage transmission line measuring 2.5 kilometres (2 mi) in length, to a location where it enters the national electricity grid of Benin.

In December 2021, the Beninese Minister of Energy announced that the design and size of the solar farm had been increased from the original 25MW to a new capacity of 50MW.

Developers

The Beninese government selected the French engineering and construction conglomerate Eiffage to design, construct, operate, maintain the solar farm for the first three years of commercial operation, then transfer it to SBEE. Eiffage in turn, tasked two of its subsidiaries, Eiffage Énergie Systèmes and RMT to carry out the task. During the first three years of commercial operations, Eiffage engineers will train SBEE engineers and technicians on the solar farm operations and maintenance.

Construction timeline, costs and funding

The engineering, procurement and construction (EPC) contractor is a consortium comprising Eiffage Energy Systems and RMT, both of whom are subsidiaries of the Eiffage Group. The first phase of the power station cost US$72 million. It is expected that with the doubling of capacity during the second phase, the cost will increase.

During the first phase, the power station has benefitted from loans provided by the European Union and the French Development Agency. Construction of the first phase started during the second half of 2021 and was expected to conclude in April 2022. Commercial commissioning of the first phase was achieved in July 2022.

In August 2023, Toyota Tsusho of Japan signed a public-private partnership (PPP) agreement with Société béninoise de production d'électricité (SBPE) (English: Beninese Electricity Production Company), to develop the second phase of Illoulofin Solar Power Station. Toyota Tsusho will work with RMT, a German subsidiary of the Eiffage Group to execute the task. The second phase is expected to bring another 25 megawatts online in 2024, bring capacity generation to 50 MW.

See also

References

  1. ^ Jean Marie Takouleu (21 July 2022). "Benin: The country's first solar power plant (25 MWp) goes operational in Illoulofin". Afrik21.africa. Paris, France. Retrieved 21 July 2022.
  2. ^ Patrick Mulyungi (14 December 2021). "Illoulofin Solar Power Plant Capacity to Increase from 25 to 50 MWP". Construction Review Online. Nairobi, Kenya. Retrieved 17 December 2021.
  3. ^ "Travel Distance Between Sakété, Benin And Pobè, Benin With Map" (Map). Google Maps. Retrieved 17 December 2021.
  4. ^ "Travel Distance Between Cotonou, Benin And Pobè, Benin With Map" (Map). Google Maps. Retrieved 17 December 2021.
  5. ^ Patrick Mulyungi (14 August 2021). "Benin launches the construction of Illoulofin photovoltaic solar power plant". Construction Review Online. Nairobi, Kenya. Retrieved 17 December 2021.
  6. ^ Jean Marie Takouleu (10 December 2021). "Benin: Illoulofin solar power plant capacity to increase from 25 to 50 MWp". Afrik21.africa. Paris, France. Retrieved 17 December 2021.
  7. ^ Eiffage Énergie Systèmes (4 May 2021). "Eiffage Énergie Systèmes is building Benin's biggest solar power plant in the village of Illoulofin (Pobé)". Eiffage Énergie Systèmes. Asnières-sur-Seine, France. Retrieved 17 December 2021.
  8. ^ CEOBA (10 December 2021). "Benin doubles capacity of Illoulofin solar power plant to have a capacity of 50 MWp". CEO Business Africa (CEOBA). Nairobi, Kenya. Retrieved 17 December 2021.
  9. ^ Jean Marie Takouleu (15 August 2023). "Benin: Japan's Toyota Tsusho wins contract for the 2nd Illoulofin solar power plant". Afrik21.africa. Paris, France. Retrieved 15 August 2023.
  10. ^ Mienyeseighe Atalawei (12 August 2023). "Toyota Tsusho inks agreement to build a 25MW solar Power Plant in Benin". Nairobi, Kenya. Retrieved 16 August 2023.