Innerstetalsperre
Structures
The Innerste is an earth-fill dam with multiple, external, asphaltic concrete layers. It has an inspection gangway along its whole length on the upstream apron. In front of the upstream base of the dam is a shaft spillway (a flood overflow tower), into which also the bottom outlet is integrated. The water of the Innerste Dam can be pumped via a 4.6 km long diversion channel to the Grane Dam further east, where it can be used for water treatment. From 2003 to 2005 the reservoir was completely emptied and renovated, especially the asphalt sealing and the bottom outlet. This work was finished in September 2005.
Flood control
Because the reservoir only has a limited flood control capacity (i.e. its capacity is relatively small in relation to the annual discharge), it can only check flooding within certain limits. The flood relief facility (spillway) is used about every two years. Nevertheless, even when the Innerste Dam overflows, the level of retention significantly reduces and delays flooding.
Recreation
The reservoir may be used by sailing and rowing boats and for angling and camping. The Innerste Valley Railway is an old railway line, that had a halt by the Innerste Dam.
Gallery
-
Shaft spillway in the reservoir
-
Shaft spillway during renovation work
-
Reservoir at low level
-
Innerste at low water
-
View of the Innerste Dam
See also
Sources
- Peter Franke; Wolfgang Frey (1987), Talsperren in der Bundesrepublik Germany (in German), Berlin: Systemdruck, ISBN 3-926520-00-0
External links
- Harzwasserwerke.de with a link to current dam data
- Innerste Dam in the Online Harz Travel Guide