Interstate 277 (Ohio)
Interstate 277 (I-277) is a 4.14-mile (6.66 km) auxiliary Interstate Highway connecting I-76 and I-77 in Akron, Ohio. It was completed in 1970 and shares its entire length with U.S. Route 224 (US 224).
Route description
![]() | This section needs expansion. You can help by adding to it. (August 2012) |
I-277 begins at an interchange with I-76. I-277 heads east toward I-77 as a six-lane highway. The Interstate turns toward the southeast and has an interchange with State Route 93 (SR 93). I-277 has one more interchange with South Main Street before it interchanges with I-77 and its designation ends. The freeway continues as US 224.
History
The western portion of I-77 originally joined I-76 with Waterloo Road and was opened in 1962. The remainder of the Interstate was completed in 1970.
Exit list
The entire route is in Akron, Summit County.
mi | km | Exit | Destinations | Notes | |
---|---|---|---|---|---|
0.00 | 0.00 | 1 | ![]() ![]() ![]() ![]() ![]() ![]() | Western terminus; I-76 exit 18; exit 1 is for 76 eastbound; western end of US 224 concurrency | |
1.34 | 2.16 | 2 | ![]() | ||
2.47 | 3.98 | 3 | South Main Street | ||
3.74 | 6.02 | 4 | ![]() ![]() ![]() | Eastern terminus; I-77 exits 122A-B; signed as exits 4A (south) & 4B (north); eastern end of US 224 concurrency | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|