Completed in 1973, the dam is a zoned earth and rock fill structure, standing 385 feet (117 m) high with a crest length of 1,800 feet (550 m). At full pool, the reservoir has a storage capacity of 1,185,000 acre-feet (1.462×10 m), encompassing 75 miles (121 km) of shoreline and 7,500 acres (3,000 ha). Floodwater is released through a spillway controlled by two 40-by-32-foot (12.2 m × 9.8 m) gates, with a capacity of 45,700 cubic feet per second (1,290 m/s).
The dam supports a 710 megawatts (950,000 hp) hydroelectric station, generating power from four turbines. Two of the turbines were installed in 1973, while the third and fourth units came online in 1975. The power station functions as a pumped-storage operation designed to provide peaking power, and generates an average of 811 million kilowatt-hours (2.92×10 MJ) per year. The dam is shown under construction in the 1972 thriller film Deliverance.
See also
References
- ^ "Lake Jocassee and Jocassee Pumped Storage Facility". The Keowee-Toxaway Project. Duke Energy. Archived from the original on 2014-10-16. Retrieved 2012-08-20.
- ^ "Special Topics" (PDF). South Carolina Water Assessment. South Carolina Department of Natural Resources. Retrieved 2012-08-20.
- ^ "Oconee Nuclear Station ISFSI Safety Analysis Report" (PDF). United States Nuclear Regulatory Commission. 2000-12-31. Retrieved 2012-08-20.
- ^ "Keowee-Toxaway Hydroelectric Project Description". Duke Energy. Archived from the original on 2014-10-16. Retrieved 2012-08-20.