Loading
  • 21 Aug, 2019

  • By, Wikipedia

Kai Tak Nullah

The Kai Tak Nullah (Chinese: 啟德明渠, also known as the Kaitak River or Kai Tak River (啟德河)) is a nullah or watercourse that collects water from the rivers and streams flowing from the hills in northern New Kowloon. It empties into a narrow channel leading into the Kwun Tong Typhoon Shelter. Part of the nullah is covered by roads and other facilities.

The Kai Tak Nullah is about 2.4 km (1.5 mi) in length. It flows from Po Kong Village Road along Choi Hung Road, pass Tung Tau Estate and San Po Kong, into Kai Tak Development Area before discharging into the Victoria Harbour at the Kwun Tong Typhoon Shelter. It has an upstream and a midstream. The nullah is one of the major flood relief drainage channels in the East Kowloon area. The improvement work of Kai Tak Nullah has been overseen by the Civil Engineering and Development Department since March 2012, aiming to turn the nullah into an attractive green river corridor. It was anticipated to be fully completed before 2021.

History

Originally, the location of Kai Tak Nullah was a bay. During Japanese occupation, Kai Tak Airport was expanded through land reclamation. The extension of Fung Wong Kai Stream was named Lung Tsun River (龍津河). Lung Tsun River's original estuary is at the north of To Kwa Wan Road. After the airport expansion work, however, reclamation for the runway blocked the estuary, and the river was redirected to follow today's route.

During New Territories' new town development in the 1970s, the river become a nullah for Tai Po Sewage Treatment Works, Sha Tin Sewage Treatment Works and illegal discharge pollutants. This resulted in pollutants and heavy pollutants being in the water, which resulted in the waterway giving off a putrid smell. After treatment work by the Drainage Services Department in 2000, Kai Tak Nullah has seen significant improvement. Herons are occasionally now seen along the nullah.

Proposal of covering nullahs

Improvement work in May 2016

In January 2005, the Drainage Services Department announced plans for nullah-covering works for 16 nullahs, at the cost of 1.2 billion Hong Kong dollars. These included a plan to cover up part of the Kai Tak Nullah along Choi Hung Road, starting in 2010 and finishing by 2014. The Traffic and Transport Committee of Wong Tai Sin District Council demanded a faster timetable, in order to launch the greening work and widen Choi Hung Road.

As the water quality improved, at the urging of the pro-Beijing political party Democratic Alliance for the Betterment and Progress, the Federation of Trade Unions, and environment concern group Conservancy Association, the Civil Engineering and Development Department launched a feasibility study on turning the nullah into Kai Tak River. They aim to turn it into a new river like the Cheonggyecheon in South Korea.

See also

22°19′47″N 114°11′52″E / 22.3298°N 114.1977°E / 22.3298; 114.1977

References

  1. ^ "Kai Tak River". www.ktd.gov.hk. Retrieved 2021-05-02.
  2. ^ "Public Engagement for Building our KaiTak River-Vision". Retrieved 21 August 2016.
  3. ^ 啟德明渠恐難成「河」 水量水質成隱憂 Archived 2012-07-12 at archive.today《明報》,2007年8月17日
  4. ^ Conservancy Association and Legislative Councillor Chan Yuen-han proposed to government an "Urban Eco-river" in San Po Kong,gave the nullahs a new name as Kai Tak River. Details refers to 啟德河網誌
  5. ^ 啟德明渠有望變清溪生態園 600米河道 料免全面覆蓋。參見 600米河道 料免全面覆蓋 Archived 2012-07-09 at archive.today《明報》,2008年2月16日