Kambar-Ata-2 Hydroelectric Power Station
The Kambar-Ata-2 Hydro Power Plant (Kyrgyz: Камбар-Ата-2 ГЭСи, Russian: Камбаратинская ГЭС-2) is a hydroelectric power station on the river Naryn near Kara-Jygach, Toktogul District, Kyrgyzstan. When completed, it will have 3 individual Francis turbine-generators with a nominal output of around 120 MW each, with a combined generation capacity of 360 MW electricity. The first generator was operational on November 27, 2010. The power plant's dam is 60 m (197 ft) tall and it creates a 70,000,000 m (56,750 acre⋅ft) reservoir of which 8,000,000 m (6,486 acre⋅ft) is active (or useful) for power generation.
References
- ^ "Kambar-Ata-2 hydropower plant produces 19 million kWh of power since launch". AKIpress News Agency (Kyrgyzstan). 11 January 2011. Archived from the original on 12 July 2011. Retrieved 21 January 2011.
- ^ "Kambar-Ata-2 HPP" (in Russian). Energo-ES. Retrieved 14 January 2022.
- ^ "List of major hydroelectric facilities Kyrgyzskoy Republic" (PDF) (in Russian). CA Water. Retrieved 24 February 2012.