K-96 is a 300-mile-long (480 km) state highway in central and southern Kansas. Its western terminus is at the Colorado state line east of Towner, Colorado, where it continues as Colorado State Highway 96; its eastern terminus since 1999 is at U.S. Route 54/U.S. Route 400 in eastern Wichita.

The eastern terminus was once at the Missouri state line, where the road continued as Route 96. With the construction of US-400, K-96 was either concurrent with or bypassed by this road, and the road was decommissioned east of the current eastern terminus. It was concurrent with U.S. Route 75 between Neodesha and Independence; and from Independence to Columbus, it was replaced with a realigned U.S. Route 160. East of Alternate U.S. Route 69, it was turned over to Cherokee County. In Missouri, Missouri 96 was terminated at Route 171, and the section between Missouri 171 and the Kansas state line was turned into Missouri Supplemental Route YY.

Route description

K-96 as it enters Kansas from Colorado

K-96 begins at the Colorado border in Greeley County, just east of Towner, Colorado. It heads east from this point, bypassing Horace to the south and crossing K-27 in Tribune. After crossing into Wichita County, it bypasses Selkirk to the south and meets K-25 in Leoti. It exits the city and travels roughly 8 miles, before running south of Marienthal. Here it intersects K-167 which connects to Marienthal. The highway then passes to the south of Modoc. K-96 reaches an intersection with US-83 in Scott City, followed by 24 miles (38.6 km) without another highway junction until K-23 at Dighton.

After leaving Dighton, K-96 runs parallel to Walnut Creek, providing access to a George Washington Carver Monument and passing north of Beeler. It meets US-283 at Ness City. East of Ness City, K-96 runs through Bazine, Alexander, and Nekoma. It crosses US-183 at Rush Center, then bypasses Timken and runs through Albert and Heizer, gradually curving south to enter Great Bend.

In Great Bend, K-96 begins a concurrency with US-56 and K-156 as it crosses US-281. Just past Great Bend, K-156 leaves the overlap and heads northeast towards Ellsworth. K-96 and US-56 continues east and pass through Ellinwood and Chase before entering Lyons, where K-96 heads south with K-14, while US-56 continues east to McPherson and Interstate 135. K-96 and K-14 pass through Sterling and then turn east. K-14 and K-96 continue east until Nickerson, where it takes a more southeast course to bypass Hutchinson to the west and south. Through South Hutchinson, it has a brief quadruple concurrency with US-50 and K-61.

K-96 overlapped with US-56 and K-156
I-35 at its exit for K-96

After splitting from US-50 and K-61, K-14 splits off to continue south. K-96, heading southeast, provides access to, but does not directly serve, the Amish community of Yoder, while also going through Haven, Mount Hope, and Maize before entering Wichita. Throughout the Wichita metropolitan area, K-96 is a freeway. It concurs with Interstate 235 until that route ends at I-135, which it briefly follows southward until it splits off westbound onto its own freeway alignment. It continues eastbound until reaching the Jabara Airport, where it curves south. K-96 has an interchange (exit 53) with Interstate 35 (the Kansas Turnpike) before it ends at a trumpet interchange with US-54/400.

K-96 between Rush Center and Wichita is a part of the National Highway System.

Between Hutchinson and Wichita, K.S.A. 68-1044 designates K-96 as the State Fair Freeway (even though it is not a full freeway).

History

The Wichita-Hutchinson segment was straightened in the early 1970s, bypassing the towns of Maize and Mount Hope. In recent years, urban sprawl has brought the highway within city limits. Near the Amish community of Yoder, symbolic warning signs were placed on the road to warn drivers of the presence of carriages on the cross streets.

View along K-96 in Scott City

In a May 3, 1995 resolution, it was approved to move US-400 and K-96 to a new alignment between northwest of Fredonia and Neodesha, at that time the overlap with K-47 was removed. In a December 3, 1998 resolution, it was approved to truncate K-96 to end at US-400 by Wichita.

By 1996, the roadway had been widened to a four-lane expressway, and the symbolic warning signs near Yoder were not retained, as the signs did not comply with the Manual on Uniform Traffic Control Devices at the time. An interchange was built at Yoder Road; however, carriage traffic still crossed the roadway at-grade. In September 2000, a minivan heading home from the Kansas State Fair struck a carriage, killing the elderly occupants and their horses. The driver of the van could not see the carriage in time to avoid the accident, and was cleared of wrongdoing. The Kansas Department of Transportation received bad publicity in the wake of the accident because of the removal of the carriage warning signs. Despite the non-compliance with the MUTCD, new symbolic signs were installed along the roadway in 2001. The expressway segment of K-96 has been posted with a speed limit of 65 miles per hour (105 km/h) since the repeal of the national speed limit. This has also been a contention in accidents along this stretch, and some state legislators have attempted to write legislation to lower the speed limit along this stretch.

Future

KDOT plans to realign K-96 and K-14 between the north end of the super two, southeast of Nickerson, to the current alignment north of Sterling, which will bypass Nickerson and Sterling. The new $96.5 million highway will be a super two, built on a four-lane right-of-way. As of October 2017, there were only three tracts in Rice County and two tracts in Reno County that needed to be purchased. In 2019, KDOT announced that construction is expected to begin in April 2021, and to be completed by November 2022. The project, part of a plan to build a diagonal corridor from Wichita northwest through Hutchinson and Great Bend to I-70 in Hays, was first considered by the state Legislature in 1986. Construction of the Reno and Rice county segment was originally going to begin January 2017 and be complete by June 2018, but was cancelled then due to lack of funding. On April 9, 2021, KDOT announced that the $81.7 million project will begin around April 26, 2021 and will be completed by June 16, 2023. The new section will be a super-two built to freeway standards, so it could be easily upgrade to four-lanes in the future. It will have a 70 mile-per-hour speed limit and no at-grade intersections. Diamond interchanges are going to be installed at 56th and Nickerson Boulevard in Reno County, as well as north of Sterling in Rice County. Bob Bergkamp Construction Company Incorporated of Wichita will be the primary contractor on the project.

Major junctions

CountyLocationmikmExitDestinationsNotes
Greeley0.0000.000
SH 96 west – Sheridan Lake
Continuation into Colorado
Tribune15.92225.624 K-27 (Broadway Avenue)
WichitaLeoti37.57860.476 K-25 (4th Street) – Lakin, Russell Springs
45.44973.143
K-167 north – Marienthal
Southern terminus of K-167
ScottScott City62.05899.873 US-83 (Main Street)
LaneDighton85.918138.272 K-23 (Main Street) – Gove, Cimarron
NessNess City117.161188.552 US-283 (Pennsylvania Avenue) – Jetmore, WaKeeney
RushRush Center149.772241.035 US-183 – La Crosse, Kinsley
BartonGreat Bend179.549288.956
US-56 / K-156 west (10th Street) – Larned
West end of US-56/K-156 concurrency; former US-156 west
181.326291.816 US-281 (Main Street) – Russell, St. John
185.121297.923
K-156 east – Ellsworth
East end of K-156 concurrency; former US-156 east
RiceLyons212.196341.496

US-56 east (Main Street) / K-14 north (Grand Avenue) – Ellsworth, McPherson
East end of US-56 concurrency; west end of K-14 concurrency
SterlingWest end of super two
RenoNickerson Road
56th Avenue – Nickerson
238.909384.487Wilson Road / Nickerson Boulevard
241.431388.5464th Avenue
242.931390.9606th Avenue
244.819393.998

US-50 west / K-61 south (John Neal Memorial Highway) – Kinsley, Pratt
Partial cloverleaf interchange; east end of super two, west end of expressway section; west end of US-50/K-61 concurrency; former K-14 south
South Hutchinson246.331396.431

US-50 east / K-61 north (John Neal Memorial Highway) / Main Street north – Newton, McPherson
Interchange; east end of expressway section; east end of US-50/K-61 overlap; access to Hutchinson Regional Medical Center
249.056400.817
K-14 south
East end of K-14 concurrency; former K-17
Yoder253.892408.600Yoder RoadInterchange
Sedgwick278.627448.407119th Street WestAt-grade intersection; west end of freeway section
Maize279.669450.084Maize Road / 53rd Street NorthMaize Rd. is former K-296 west
Wichita282.419454.509Ridge Road
283.466456.194Hoover RoadWestbound exit and eastbound entrance
284.469457.808West Street
286.015–
286.503
460.297–
461.082

I-235 south
Eastbound exit and westbound left entrance; I-235 exit 13
Meridian Avenue
Valley Center
Eastbound signage
Westbound signage

I-235 south
West end of I-235 concurrency; westbound left exit and eastbound left entrance; I-235 exit 13
287.473462.64315Broadway StreetExit number follows I-235
288.413464.156



I-235 ends / I-135 north / US-81 north / K-15 north – Salina

K-254 east – El Dorado
Western terminus of K-254; east end of I-235 concurrency; I-235 exit 16A; west end of I-135/US-81/K-15 concurrency; I-135 exit 11B
289.619466.097


I-135 south / US-81 south / K-15 south
East end of I-135/US-81/K-15 concurrency; I-135 exit 10
289.710466.24329th Street North / Hydraulic AvenueNo westbound entrance
290.714467.859Hillside Street
291.749469.525Oliver Avenue
292.749471.134Woodlawn Road
293.725472.705Rock Road
294.908474.608Webb Road
296.086476.504Greenwich Road
296.886477.79221st Street North
297.895479.41613th Street North
299.450481.918 I-35 / Kansas Turnpike / 127th Street EastI-35/Kansas Tpke. exit 53 northbound, 53B southbound
300.201483.127 US-54 / US-400 – AugustaEastern terminus; trumpet interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ Staff (2016). "Pavement Management Information System". Kansas Department of Transportation. Retrieved April 22, 2017.
  2. ^ "68-1044. Designation of part of K-96 highway as the state fair freeway". kslegislature.org. Kansas State Legislature. Retrieved 2019-05-01.
  3. ^ Kansas Department of Transportation (May 5, 1995). "Resolution to relocate, redesignate and withdraw segments of highway in Wilson County". Topeka: Kansas Department of Transportation. Retrieved July 13, 2021.
  4. ^ Kansas Department of Transportation (December 3, 1998). "Rural Resolution to remove K 96 from US 400 in Wilson County". Topeka: Kansas Department of Transportation. Retrieved July 14, 2021.
  5. ^ Kansas Department of Transportation (December 3, 1998). "Rural Resolution to remove K 96 from US 400 in Butler County". Topeka: Kansas Department of Transportation. Retrieved July 14, 2021.
  6. ^ Stan Finger (August 8, 2014). "Roadside memorials: How much is too much?". Wichita: The Wichita Eagle / Kansas.com. Retrieved August 3, 2022.
  7. ^ Hogg, Dale (September 7, 2019). "Northwest Passage back or track". Great Bend, KS: Great Bend Tribune. Archived from the original on September 15, 2019. Retrieved March 8, 2021.
  8. ^ Green, John (August 22, 2019). "Construction of Northwest Passage targeted to begin in 2021". Hutchinson, KS: The Hutchinson News. Archived from the original on March 3, 2021. Retrieved March 8, 2021.
  9. ^ "K-96 Highway – Hutchinson, Kansas to Sterling, Kansas Talking Points – History, description, current status" (PDF). Topeka, KS: Kansas State Legislature. October 4, 2018. Archived (PDF) from the original on August 2, 2021. Retrieved March 8, 2021.
  10. ^ Kansas Department of Transportation (April 9, 2021). "15-mile realignment of K-14 in Reno, Rice counties to start soon - KDOT". Topeka: Kansas Department of Transportation. Retrieved January 11, 2022.