Karawang HSR Station
Currently, Karawang Station is not yet able to provide services for boarding and alighting passengers of the Whoosh high-speed rail, because it is still in the completion stage of construction of this project. The main road access from the Jakarta–Cikampek Toll Road is still unavailable and not constructed yet, regarding to land acquisitions. It was previously expected to be operational in February 2024.
Station layout
This station has four tracks with two straight tracks which are only used for direct overtake and two turning tracks which are equipped with side platforms. Apart from the four main lines for train services, this station also has a depot for storing comprehensive inspection trains (EMU-CIT) and ballast stone trains to the south of the emplacement.
![]() | ||||
1st floor | Mechanical train depot access line | |||
Side platform, the doors are opened on the right side | ||||
Line 4 | ← (Padalarang) | ![]() |
||
Line 3 | ← (Padalarang) | Straight tracks for direct overtake | ||
Line 2 | Straight tracks for direct overtake | (Halim) → | ||
Line 1 | ![]() | |||
Side platform, the doors are opened on the right side | ||||
Ground floor | Entrance and exit, drop-off area, ticket vending machines, customer service/locket, retail kiosks, and inter-platform connection tunnel |
Gallery
-
Karawang HSR Station under construction, viewed from the MBZ Skyway, February 2023
-
Karawang HSR Station's platform, October 2023